Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
3/9/2023 |
Passed: Building - Footer |
|
Matt Forsyth |
3/9/2023 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
3/9/2023 |
Failed: Electrical - Temporary Service |
Non At Site |
Gary Pitzer |
3/17/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Underground Plumbing Only,no Gas |
Gary Pitzer |
3/17/2023 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
3/17/2023 |
Release to power company |
|
Troy Crews |
3/17/2023 |
Passed: Building - Slab |
|
Matt Forsyth |
3/22/2023 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
4/20/2023 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
4/20/2023 |
Passed: Building - Framing |
One Stud Pack Missing Will Check On The Insulation Inspection |
Matt Forsyth |
5/17/2023 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
5/17/2023 |
Passed: Mechanical - Rough In |
One Flexible Duct Not Finished Will Check On Insulation Inspection |
Matt Forsyth |
5/17/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
5/17/2023 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Tub Water Tested |
Matt Forsyth |
5/17/2023 |
Cancelled: Building - Framing |
|
Matt Forsyth |
5/18/2023 |
Cancelled: Electrical - 2nd Rough-In |
|
Matt Forsyth |
5/18/2023 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
5/18/2023 |
Cancelled: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
5/18/2023 |
Cancelled: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
5/18/2023 |
Passed: Building - Insulation |
Items Addresse |
Matt Forsyth |
5/25/2023 |
Passed: Electrical - Permanent Power |
Docs Septic And Driveway Needed To Release Power |
Matt Forsyth |
7/19/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
7/27/2023 |
Release to power company |
|
Emaleigh Williams |
8/1/2023 |
Septic Release Inspection |
|
Health Dept |
8/1/2023 |
Passed: Building - Final |
|
Matt Forsyth |
8/21/2023 |