Permit Details

Permit Search

Permit

New Residential Construction

125 SW HERMITAGE GLN
HIGH SPRINGS, FL 32643

Permit #
000046636
Application #
58749
Status Completed
  1. Submitted Jan 18, 2023
  2. Issued Mar 2, 2023
  3. Expires Aug 18, 2024
  4. Completed Feb 20, 2024

Property

Parcel #
10039-107
Owner
Geiger Farms, Llc,
Acres
5.00
Subdivision
Hermitage
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
56.12'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0551C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
30' (2nd front)
Setbacks Rear
25'
Stories
2
Heated Area (Sqft)
3116
Total Area (Sqft)
5020
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0002
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Plan Review - Corrections Needed
  4. Plan Review - On Hold-Incomplete
  5. Plan Review - Processing
  6. Plan Review - Documents Required
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Corrections Needed
  14. Zoning Review - Corrections Needed
  15. Zoning Review - Reviewed
  16. Final Review - Documents Required
  17. Final Review - Reviewed
  18. Final Review - Payment Needed
  19. Permit Issued

Contractors

  • Jerry A Lerner

    Lerner Luxury Properties Llc

    License
    CBC015604
    Title
    Building Contractor
    Role
    Contractor

    County License & State License Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Matthew J Mcclellan

    Hometown Heating And Air Inc

    License
    CAC1818078
    Title
    Class B Air Conditioning
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Paul K Coleman

    Colemans Plumbing Inc.

    License
    CFC1425624
    Title
    Certified Plumbing
    Role
    Subcontractor

    County License & State License & Employees Workers Comp Expired.

  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Subcontractor

Inspections

  1. Mar 3, 2023

    Passed: Electrical - Temporary Service

    Inspected by Anthony Aslan

  2. Mar 3, 2023

    Release to power company

    Inspected by Anthony Aslan

  3. Mar 3, 2023

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Mar 3, 2023

    Passed: Building - Footer

    Per Florida Statue Noc To Be Posted On Site And Permit

    Inspected by Anthony Aslan

  5. Mar 13, 2023

    Rescheduled 3/14/2023:Plumbing/Gas - 1st Underground Rough–In

    Inspected by Emaleigh Williams

  6. Mar 14, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Need Engineer Letter Or Confirmation Of One Foot Above Road Prior To Slab Pour.

    Inspected by Troy Crews

  7. Mar 16, 2023

    Passed: Building - Slab

    Inspected by Anthony Aslan

  8. Apr 26, 2023

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. Apr 26, 2023

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  10. Apr 26, 2023

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  11. Jun 7, 2023

    Cancelled: Building - Rated Assembly Fastening

    Inspected by Anthony Aslan

  12. Jun 7, 2023

    Passed: Building - Framing

    Missing Nails Bay Window

    Inspected by Anthony Aslan

  13. Jun 7, 2023

    Passed: Building - Strapping

    Inspected by Anthony Aslan

  14. Jun 7, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  15. Jun 7, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  16. Jun 7, 2023

    Failed: Mechanical - Rough In

    Missing Gaskets Returns And Supplies, Can Stock On Returns Outside Of Duct Board, Exhaust Fans Connections To Roof, Kitchen Exhaust Duct No Tape On Pipe Joints.

    Inspected by Anthony Aslan

  17. Jun 13, 2023

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  18. Jun 13, 2023

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  19. Aug 16, 2023

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Anthony Aslan

  20. Sep 6, 2023

    Release to power company

    Inspected by Anthony Aslan

  21. Sep 6, 2023

    Septic Release Inspection

    Inspected by Health Dept

  22. Feb 9, 2024

    Failed: Building - Final

    -both Upstairs Bathrooms Gfci's Open Ground, Open Neutral -outlet Cover Missing In Laundry Room -both A/c Refrigerant Lines Need Uv Protective Insulation -missing Back Flow On Hose Bib By Electrical Panel gas Not Connected To Water Heater Or Outside Grill

    Inspected by Anthony Aslan

  23. Feb 20, 2024

    Passed: Building - Final

    Corrections Made

    Inspected by Anthony Aslan

Documents