Permit Details

Permit Search

Permit

New Residential Construction

331 NW GABLES GLN
LAKE CITY, FL 32055

Permit #
000046617
Application #
58714
Status Completed
  1. Submitted Jan 22, 2023
  2. Issued Mar 1, 2023
  3. Expires Jun 20, 2026
  4. Completed Jan 5, 2026

Property

Parcel #
02017-104
Owner
Fleming Larry
Acres
4.78
Subdivision
Gables
Zoning
A-3
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Not yet released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0170D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2800
Total Area (Sqft)
4252
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0979
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - On Hold-Incomplete
  4. Plan Review - On Hold-Incomplete
  5. Plan Review - On Hold-Incomplete
  6. Plan Review - On Hold-Incomplete
  7. Point Review - Reviewed
  8. Plan Review - Documents Required
  9. Plan Review - Building Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Mechanical Approved
  12. Plan Review - Plumbing Approved
  13. Plan Review - Fuel/Gas Approved
  14. Plan Review - Reviewed
  15. Zoning Review - Reviewed
  16. Final Review - Documents Required
  17. Final Review - Reviewed
  18. Final Review - Reviewed
  19. Final Review - Payment Needed
  20. Permit Issued
  21. Permit Status Update Notification
  22. Permit Status Update Notification

Contractors

This is an owner-builder project.

Inspections

  1. Mar 9, 2023

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Mar 9, 2023

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Mar 9, 2023

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Mar 9, 2023

    Release to power company

    Inspected by Troy Crews

  5. Jun 27, 2023

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Waste Lines Test Leaked Down Not Full 5 Foot Test.

    Inspected by Troy Crews

  6. Jul 10, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Water Test Now On Lines

    Inspected by Troy Crews

  7. Jul 24, 2023

    Passed: Building - Slab

    Need Plans In Box For Future Inspections

    Inspected by Troy Crews

  8. Oct 6, 2023

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  9. Oct 6, 2023

    Cancelled: Building - Framing

    Inspected by Troy Crews

  10. Oct 6, 2023

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  11. Feb 6, 2024

    Passed: Building - Roof Decking

    Pull All Missed Mails

    Inspected by Troy Crews

  12. Feb 6, 2024

    Failed: Building - Framing

    Header And Garage Strapping Not Complete

    Inspected by Troy Crews

  13. Feb 6, 2024

    Failed: Building - Strapping

    Not Complete

    Inspected by Troy Crews

  14. Feb 13, 2024

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  15. Mar 5, 2024

    Passed: Building - Strapping

    Inspected by Troy Crews

  16. Jun 27, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  17. Jun 27, 2024

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  18. Jun 27, 2024

    Failed: Plumbing/Gas - 2nd Rough-In

    Need Pressure On Plumbing And Call In Framing Inspection. Back Porch Corner Still Needs Raising

    Inspected by Troy Crews

  19. Jul 3, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Pressure On

    Inspected by Troy Crews

  20. Jul 3, 2024

    Passed: Building - Framing

    Inspected by Troy Crews

  21. Jul 17, 2024

    Passed: Building - Insulation

    Batts Ceiling And Walls

    Inspected by Gary Pitzer

  22. Jun 30, 2025

    Passed: Building - Spot Check

    Owner Had Problems With Contractor Resuming Project Himself

    Inspected by Troy Crews

  23. Dec 2, 2025

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Troy Crews

  24. Dec 2, 2025

    Passed: Building - Final

    Assessments Owed- Payment Rec'd-- 1.5.26 Mg picture Of Front Steps Repair And Line On Pop Off Water Heater-- Completed 12.22.25 Mg

    Inspected by Troy Crews

  25. Dec 22, 2025

    Passed: Building - Final

    *water Heater, Steps, And Sealing Pipe Done *assessments Owed-- 12.31.25 Mg

    Inspected by Crews, Malcolm T.

Documents