Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Anthony Aslan |
3/2/2023 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
3/2/2023 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
3/13/2023 |
Release to power company |
|
Anthony Aslan |
3/13/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
4/6/2023 |
Passed: Building - Slab |
|
Anthony Aslan |
4/19/2023 |
Passed: Building - Wall Sheathing |
Partial, Gables Not Complete
sheating Sheet Does Not Go From Top Of Top Plate Refer To Drawings |
Anthony Aslan |
6/1/2023 |
Failed: Building - Roof Decking |
Spoke With Framer On Site On What To Cover, Roof Decking Not. Complete |
Anthony Aslan |
6/1/2023 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
6/8/2023 |
Passed: Building - Framing |
Loose Rods Buy Garage And Buy Hall Bath Recheck It Installation |
Anthony Aslan |
7/25/2023 |
Passed: Building - Strapping |
|
Anthony Aslan |
7/25/2023 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
7/25/2023 |
Passed: Mechanical - Rough In |
Insulation Missing On Some Boots And Need To Pull Off Insulation Backing On Other Boots Recheck It Insulation |
Anthony Aslan |
7/25/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
7/25/2023 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
7/25/2023 |
Passed: Building - Insulation |
Spray Foam |
Anthony Aslan |
8/14/2023 |
Release to power company |
|
Melissa Garber |
11/28/2023 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
11/28/2023 |
Septic Release Inspection |
Septic Rec'd |
Health Dept |
11/28/2023 |
Failed: Building - Final |
Need Blower Door
need Final Termite
no Disconnect At Ahu
disconnect Behind Condenser
a/c Refrigerant Piping Out Side Not Uv Protective Type
no Disconnect At Water Heater |
Anthony Aslan |
12/28/2023 |
Passed: Building - Final |
No Disconnect On Water Heater |
Anthony Aslan |
1/12/2024 |