Roof Replacement or Repair
Permit
| Application #: | 59165 |
| Permit #: |
000046585 |
| Related Permit: |
|
| Submitted: | Thursday, February 23, 2023 |
| Issued: | Friday, February 24, 2023 |
| Expires: | Wednesday, September 6, 2023 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0280D |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Repairs to decking due to fire |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
4500 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Asphalt Shingles |
| Florida Product Approval Number |
FL10124 R31 |
| Product Manufacturer |
GAF |
| Product Description |
30 yr Architectural |
| Building Code Edition |
2020 Florida Building Code 7th Edition and Florida Statute 553.844 |
| Sealed roof decking options: (Must select an option.) |
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified. |
| Ventilation: |
Off-ridge Vent |
| Flashing: |
Use Existing |
| Drip Edge: |
Repair Existing |
| Valley Treatment: |
New Metal |
| Second Roof Pitch (if applicable) |
4:12 or Greater |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 2/17/2023 |
Application pending. |
| 2/23/2023 |
Application submitted by applicant. |
| 2/23/2023 |
Final Review - Payment Needed |
| 2/24/2023 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Blake N Lunde Ii Blake Roofing Inc
Liability Insurance Expired. |
CCC1331699 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Roof Comlpete At Time Of In Progress Inspection. In The Future We Need To See In Progress Work . Please Provide Detailed Pictures Of Work |
Gary Pitzer |
3/10/2023 |