Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Setbacks |
|
Gary Pitzer |
2/17/2023 |
Passed: Building - Footer |
Footer Bond Wire Attached To Footer Steel |
Gary Pitzer |
2/17/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Drains Only ,no Water Or Gas |
Gary Pitzer |
2/24/2023 |
Passed: Building - Slab |
Plastic Wire And Rebar |
Gary Pitzer |
2/28/2023 |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
3/9/2023 |
Release to power company |
|
Troy Crews |
3/14/2023 |
Failed: Electrical - Temporary Service |
No Temporary Pole At Site |
Gary Pitzer |
3/14/2023 |
Passed: Electrical - Temporary Service |
Was Across The Street. |
Troy Crews |
3/14/2023 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
3/31/2023 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
3/31/2023 |
Passed: Building - Framing |
|
Matt Forsyth |
4/20/2023 |
Cancelled: Building - Framing |
|
Matt Forsyth |
5/1/2023 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
5/1/2023 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
5/1/2023 |
Failed: Plumbing/Gas - 2nd Rough-In |
Water Supply Not Under Pressure |
Matt Forsyth |
5/1/2023 |
Passed: Building - Insulation |
Walls Only |
Matt Forsyth |
5/3/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
5/3/2023 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
6/12/2023 |
Release to power company |
|
Melissa Garber |
6/29/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
6/29/2023 |
Septic Release Inspection |
|
Health Dept |
6/29/2023 |
Release to power company |
|
Anthony Aslan |
8/29/2023 |
Certificate-Release Certificate |
|
Anthony Aslan |
8/29/2023 |
Passed: Building - Final |
Need Picture Of Uv Insulation On Outside Condenser Line Set
need Picture Of Hose Bib Back Flow On Back Of House |
Anthony Aslan |
8/29/2023 |