Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Plumbing Only |
Gary Pitzer |
2/8/2023 |
Failed: Building - Framing |
No Stairs To Second Floor To Complete Inspection |
Gary Pitzer |
5/26/2023 |
Failed: Mechanical - Rough In |
No Access To Second Floor, If There Is To Be A Fire Place In The Corner Of First Floor It Needs Installed |
Gary Pitzer |
5/26/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
5/26/2023 |
Failed: Electrical - 2nd Rough-In |
No Access To Second Floor |
Gary Pitzer |
5/26/2023 |
Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
5/30/2023 |
Passed: Mechanical - Rough In |
|
Gary Pitzer |
5/30/2023 |
Failed: Building - Framing |
Wall Framing Does Not Match What Has Been Approved, There Still The Issues With Draft Stopping That Was Discussed Per Phone Conversation Twice That Have Not Been Address, Is The Hvac Equipment Going To Remain In The Open On The Loft Area? |
Gary Pitzer |
5/30/2023 |
Passed: Building - Insulation |
|
Troy Crews |
6/28/2023 |
Passed: Building - Framing |
Engineering Letter Recieved |
Troy Crews |
6/29/2023 |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/8/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
9/19/2023 |
Failed: Electrical - Temporary Service |
Septic Incomplete, Wiring In Exterior Plane Needs Terminated |
Gary Pitzer |
9/27/2023 |
Passed: Electrical - Temporary Service |
Per Photos Supplied For Defect |
Gary Pitzer |
10/6/2023 |
Release to power company |
|
Gary Pitzer |
10/6/2023 |
Septic Release Inspection |
|
Health Dept |
10/11/2023 |
Passed: Building - Final |
|
Gary Pitzer |
12/1/2023 |