Permit Details

Permit Search

Permit

Mobile Home

562 SW MARY TER
LAKE CITY, FL 32024

Permit #
000046421
Application #
58662
Status Completed
  1. Submitted Jan 10, 2023
  2. Issued Feb 1, 2023
  3. Expires Sep 2, 2023
  4. Completed Mar 6, 2023

Property

Parcel #
00459-217
Owner
Tritt Charles, Tritt Kimberly & Frances D Benson
Acres
10.04
Subdivision
Timber Ridge Unr
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0370C
In floodway
N
Mobile Home is a:
Single Wide
Year Built
2022
Width (Ft.In)
16
Length (Ft.In)
56
Driveway access to home:
Existing Drive
Installation Decal #
95071
Special temporary use permit number:
stup2301-01
Septic #
23-0042
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
WHC029514GA
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Documents Required
  9. Final Review - Reviewed
  10. Final Review - Payment Needed
  11. Permit Issued

Contractors

  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1025142
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Steven M Mollman

    Mollman Air Conditioning And Refrigeration Llc

    License
    CAC1819696
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Mar 6, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic

    Inspected by Matt Forsyth

  2. Mar 6, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Mar 8, 2023

    Septic Release Inspection

    Inspected by Health Dept

  4. Mar 17, 2023

    Release to power company

    Inspected by Melissa Garber