Permit Details

Permit Search

Permit

New Residential Construction

550 SW MANDIBA DR
LAKE CITY, FL 32024

Permit #
000046391
Application #
58474
Status Completed
  1. Submitted Dec 21, 2022
  2. Issued Jan 27, 2023
  3. Expires May 14, 2024
  4. Completed Nov 16, 2023

Property

Parcel #
09280-118
Owner
Roberts James Terrell, Roberts Melissa P
Acres
1.97
Subdivision
Oaks Of Lake City Phase 1
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
77'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2597
Total Area (Sqft)
4340
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
23-0058
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Corrections Needed
  6. Plan Review - Building Approved
  7. Plan Review - Electrical Approved
  8. Plan Review - Mechanical Approved
  9. Plan Review - Plumbing Approved
  10. Plan Review - Fuel/Gas Approved
  11. Plan Review - Reviewed
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Final Review - Documents Required
  15. Final Review - Documents Required
  16. Final Review - Reviewed
  17. Final Review - Payment Needed
  18. Permit Issued

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor

Inspections

  1. Feb 16, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Under Slab Plumbing Drains Only, No Water Or Gas

    Inspected by Gary Pitzer

  2. Feb 22, 2023

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Feb 22, 2023

    Passed: Building - Monolithic Slab

    Steel And Wire, Electric Bond

    Inspected by Gary Pitzer

  4. Feb 24, 2023

    Passed: Electrical - Temporary Service

    Inspected by Gary Pitzer

  5. Feb 24, 2023

    Release to power company

    Inspected by Gary Pitzer

  6. Apr 6, 2023

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  7. Apr 6, 2023

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  8. May 22, 2023

    Passed: Building - Framing

    Inspected by Gary Pitzer

  9. May 22, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  10. May 22, 2023

    Passed: Mechanical - Rough In

    Will Need Shut-valve Within 6 Ft Of Exterior Gas Fireplace

    Inspected by Gary Pitzer

  11. May 22, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  12. Jun 8, 2023

    Passed: Building - Insulation

    Roof And Gables Foam, Walls Bats

    Inspected by Gary Pitzer

  13. Aug 11, 2023

    Septic Release Inspection

    Inspected by Health Dept

  14. Sep 21, 2023

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  15. Sep 25, 2023

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  16. Sep 25, 2023

    Release to power company

    Inspected by Gary Pitzer

  17. Nov 16, 2023

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents