| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
Need Compaction Test.
multiple Issues To Be Addressed Before Final. Broken Windows, Hole In Roof, Front Door Missing, Underpining. |
Anthony Aslan |
1/19/2023 |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
1. Still In Need Of Compaction Report, Unit Is Setting On A Large Amount Of Filled Area, 2. Underlining, 3. Siding And Soffit Need Replaced Or Put Back In Place In Several Locations, 4. Permanent Steps And Landings Anchored In Place At All Exterior Doors, 5. Data Plate Information? , Work Is In Progress But The Previous Items Need To Be Addressed Prior To Power. |
Gary Pitzer |
12/31/2025 |
| Passed: Engineering - Setbacks |
Appears To Be With-in Setbacks |
Gary Pitzer |
3/2/2026 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
1.still Has Rear Landings Steps With Railings And 2. Balusters To Code, Front Porch Need Railings And Balusters To Code And 3. Post Straightened,
4. Front And Rear In Several Location Soffit And Siding Needs Repaired, 5. Plumbing Drain Needs Clean-out Added Where It Changes Direction Approx. Mid-way In Rear Of Unit, 6. No Electric Inspected |
Gary Pitzer |
3/2/2026 |
| Passed: Engineering - Setbacks |
+32" On Low End Of Units To Finish Floor, Appears To Be Within Set Baks |
Gary Pitzer |
3/10/2026 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
All Requirements Met To Release Power And Co-- 3.23.26 Mg |
Gary Pitzer |
3/10/2026 |
| Release to power company |
Rec'd Septic Final And Drive |
Ewilliams |
3/23/2026 |
| Septic Release Inspection |
|
Health Dept |
3/23/2026 |
| Submitted Power Release through FPL Portal |
|
Ward, Emaleigh C. |
3/23/2026 |
| Submitted Power Release through FPL Portal |
|
Ward, Emaleigh C. |
3/23/2026 |
| Release to power company |
Change From Fpl To Clay |
Ewilliams |
3/24/2026 |