Inspection |
Notes |
Performed By |
Date |
Cancelled: Engineering - Setbacks |
|
Gary Pitzer |
2/8/2023 |
Passed: Building - Footer |
Dug Footer With 3 Rebar, Electric Bond To Rebar |
Gary Pitzer |
2/8/2023 |
Passed: Electrical - 1st Underground Rough–In |
Several Floor Boxes And Other Conduits Under Slab |
Gary Pitzer |
3/9/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Waste Drain With 5+ft Water Column, All Drain To Back Right Corner From The Front Of House.no Water System Install At This Time |
Gary Pitzer |
3/9/2023 |
Passed: Building - Slab |
|
Gary Pitzer |
3/17/2023 |
Passed: Building - Framing |
|
Gary Pitzer |
4/20/2023 |
Failed: Mechanical - Rough In |
Not Complete For Inspection |
Gary Pitzer |
5/19/2023 |
Failed: Plumbing/Gas - 2nd Rough-In |
Not Complete For Inspection |
Gary Pitzer |
5/19/2023 |
Failed: Electrical - 2nd Rough-In |
Work Not Complete For Inspection |
Gary Pitzer |
5/19/2023 |
Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
5/30/2023 |
Passed: Mechanical - Rough In |
|
Gary Pitzer |
5/30/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
5/30/2023 |
Passed: Building - Insulation |
Roof Foamed,walls Battted |
Gary Pitzer |
6/7/2023 |
Failed: Building - Lath/Stucco |
Stucco Does Not Meet Approved Siding Per Plan, Waiting On Product Approval Info For Siding Being Installed To Complete Inspection |
Gary Pitzer |
6/28/2023 |
Passed: Building - Lath/Stucco |
What Is Installed Appears Complete At This Stage |
Gary Pitzer |
7/6/2023 |
Failed: Electrical - Permanent Power |
Need Final Septic, Drive Culvert? |
Gary Pitzer |
10/27/2023 |
Septic Release Inspection |
|
Health Dept |
10/27/2023 |
Release to power company |
|
Melissa Garber |
10/30/2023 |
Passed: Electrical - Permanent Power |
Private Drive |
Gary Pitzer |
10/30/2023 |
Release to power company |
|
Gary Pitzer |
10/30/2023 |
Passed: Building - Final |
|
Gary Pitzer |
11/6/2023 |
Failed: Engineering - Initial Driveway |
|
Smith, Blake |
1/2/2024 |