Inspection |
Notes |
Performed By |
Date |
Failed: Electrical - Temporary Service |
No Pole |
Anthony Aslan |
2/6/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
2/6/2023 |
Cancelled: Building - Slab |
|
Anthony Aslan |
2/7/2023 |
Passed: Building - Monolithic Slab |
|
Anthony Aslan |
2/7/2023 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
2/7/2023 |
Passed: Electrical - 1st Underground Rough–In |
|
Anthony Aslan |
2/7/2023 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
2/13/2023 |
Release to power company |
|
Anthony Aslan |
2/13/2023 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
2/14/2023 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
2/14/2023 |
Cancelled: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
2/16/2023 |
Passed: Building - Framing |
|
Anthony Aslan |
2/16/2023 |
Passed: Building - Strapping |
|
Anthony Aslan |
2/16/2023 |
Failed: Mechanical - Rough In |
No Gaskets On Supply. & Return Boots
no Strapping On Master Bath Exhaust Venting
check Strapping On Ducts, Sagging Ducts
dryer Can No Be Oval-shaped, Missing Nail Guards |
Anthony Aslan |
3/15/2023 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
3/15/2023 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Tub & Gas |
Anthony Aslan |
3/15/2023 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Pressure On Piping
nail Guards Missing On Vent Pipes |
Anthony Aslan |
3/15/2023 |
Failed: Mechanical - Rough In |
M1502.3.1exhaust Termination Outlet And Passageway Size.
the Passageway Of Dryer Exhaust Duct Terminals Shall Be Undiminished In Size And Shall Provide An Open Area Of Not Less Than 12.5 Square Inches (8065 Mm2). |
Anthony Aslan |
3/20/2023 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Pressure On Cold Water Supply |
Anthony Aslan |
3/20/2023 |
Septic Release Inspection |
|
Health Dept |
3/21/2023 |
Passed: Mechanical - Rough In |
Corrected |
Anthony Aslan |
3/23/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
Pressure On Cold |
Anthony Aslan |
3/23/2023 |
Passed: Building - Insulation |
Inspected 3-23-2023 |
Anthony Aslan |
3/24/2023 |
Cancelled: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
4/18/2023 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
5/8/2023 |
Release to power company |
|
Anthony Aslan |
5/8/2023 |
Passed: Building - Final |
Need Blower Door Could Not Find |
Anthony Aslan |
5/22/2023 |
Certificate-Release Certificate |
Recv'd Bdt |
Anthony Aslan |
5/23/2023 |