Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Electrical Service Permit

Address 705 SW GAINER DR
LAKE CITY, FL 32024
Parcel #: 03707-114
Acres: 5.01
Owner: Reed Noah, Olive Brandy
Subdivision: Paradise South
Zoning: A-3
Flood Zone: A
District: 5
Application #: 58534
Permit #: 000046212
Related Permit:
Submitted: Wednesday, December 28, 2022
Issued: Friday, January 6, 2023
Expires: Tuesday, December 26, 2023
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0395C
What is the power service for? Storage Building
Other job details: storage barn
Power Company Clay Electric
Septic # (00-0000) or (X00-000) x23-003
Electrical Code Edition 2017 National Electrical Code
Meter or Account: Meter
Number of requested AMPS for electrical service: 200
Is the power service? New Power Service
Residential or Commercial? Residential
Review Notes
12/28/2022 Application pending.
12/28/2022 Application submitted by applicant.
12/28/2022 Final Review - Documents Required NEEDED * ENVIRONMENTAL HEALTH RELEASE
12/29/2022 Final Review - Documents Required NEEDED * ENVIRONMENTAL HEALTH RELEASE
1/6/2023 Final Review - Payment Needed
1/6/2023 Permit Issued Permit #000046212 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 1/6/2023
Failed: Electrical - Permanent Power Need Service Conductors Between Meter And Disconnect Installed. Gary Pitzer 6/26/2023
Passed: Electrical - Permanent Power Service To Live Side Of Disconnect Only, No Load Gary Pitzer 6/29/2023
Release to power company Gary Pitzer 6/29/2023