| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
11/14/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
1/20/2023 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
1/25/2023 |
| Passed: Building - Monolithic Slab |
|
Gary Pitzer |
1/25/2023 |
| Passed: Building - Roof Decking |
|
Gary Pitzer |
2/10/2023 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Gary Pitzer |
2/10/2023 |
| Passed: Electrical - Temporary Service |
Temp Pole Only, 2 Gfci Outlets, 2 Circuts |
Gary Pitzer |
3/9/2023 |
| Release to power company |
|
Gary Pitzer |
3/9/2023 |
| Passed: Building - Framing |
|
Gary Pitzer |
3/9/2023 |
| Passed: Mechanical - Rough In |
No Furnace |
Gary Pitzer |
3/9/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
All Water Cpvc With +- 85 Psi, Tubs Set,stubs Out At Drain Locations |
Gary Pitzer |
3/9/2023 |
| Failed: Electrical - 2nd Rough-In |
Hall Bathroom Needs 20 Circuit Ran To Empty Outlet Box, Garage Requires 20 Circuit |
Gary Pitzer |
3/9/2023 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
3/13/2023 |
| Failed: Building - Insulation |
Need To Complete Electrical Rough Prior To Insulation. |
Troy Crews |
3/15/2023 |
| Passed: Building - Insulation |
|
Gary Pitzer |
3/15/2023 |
| Passed: Electrical - Permanent Power |
|
Gary Pitzer |
4/6/2023 |
| Release to power company |
|
Gary Pitzer |
4/6/2023 |
| Failed: Building - Final |
Need Fire Alarm Device Working Properly (1 Chirping), Attic Access Hole Requires A Cover And Be Rated For The Area, Trim Missing Around Garage Door, Need Proper Insulation On Ac Lines And Stay Wire Protected |
Gary Pitzer |
5/26/2023 |
| Passed: Building - Final |
|
Gary Pitzer |
6/6/2023 |