11/28/2022
|
Application pending.
|
11/28/2022
|
Application submitted by applicant.
|
11/28/2022
|
City of Lake City Utilities Notified
City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
|
11/29/2022
|
Plan Review - Reviewed
|
12/1/2022
|
Zoning Review - Reviewed
THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
12/1/2022
|
Point Review - Reviewed
THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
12/1/2022
|
Final Review - Documents Required
THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
10 FT DIFFERENCE FROM SITE TO ROAD.
|
12/5/2022
|
Final Review - Documents Required
THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
10 FT DIFFERENCE FROM SITE TO ROAD.
|
12/8/2022
|
Final Review - Documents Required
THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
10 FT DIFFERENCE FROM SITE TO ROAD.
|
12/9/2022
|
Final Review - Documents Required
THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
10 FT DIFFERENCE FROM SITE TO ROAD.
|
12/14/2022
|
Final Review - Documents Required
THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
10 FT DIFFERENCE FROM SITE TO ROAD.
|
12/16/2022
|
Final Review - Reviewed
*ENGINEER LETTER RECEIVED
|
12/20/2022
|
Final Review - Reviewed
*ENGINEER LETTER RECEIVED
|
12/20/2022
|
Final Review - Payment Needed
*ENGINEER LETTER RECEIVED
|
12/21/2022
|
Permit Issued
Permit #000046149 created and approved.
|