Mobile Home
Permit
| Application #: | 56630 |
| Permit #: |
000046120 |
| Related Permit: |
|
| Submitted: | Tuesday, September 27, 2022 |
| Issued: | Friday, December 16, 2022 |
| Expires: | Tuesday, January 31, 2023 |
| Completed: | Tuesday, January 31, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0280D |
| In floodway |
N |
| Mobile Home is a: |
Single Wide |
| Year Built |
2004 |
| Width (Ft.In) |
14 |
| Length (Ft.In) |
66 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
49874 |
| Septic # |
22-0882 |
| Setbacks Front |
25' |
| Setback Side 1 |
10' |
| Setbacks Rear |
15' |
| Dev Permit # |
F023- |
| Setback Side 2 |
10' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
gafl307a51615ww21 |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 9/27/2022 |
City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER, LC_SEWER. |
| 9/27/2022 |
Point Review - Received-Hard Copy Application |
| 9/27/2022 |
Point Review - Reviewed |
| 9/29/2022 |
Plan Review - Reviewed |
| 10/4/2022 |
Zoning Review - Reviewed |
| 10/5/2022 |
Final Review - Documents Required |
| 10/10/2022 |
Final Review - Documents Required |
| 10/19/2022 |
Final Review - Documents Required |
| 10/21/2022 |
Final Review - Documents Required |
| 12/12/2022 |
Final Review - Reviewed |
| 12/12/2022 |
Final Review - Payment Needed |
| 12/14/2022 |
Final Review - Payment Needed |
| 12/15/2022 |
Final Review - Payment Needed |
| 12/16/2022 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Robert D Sheppard Melvins Mobile Home Service
|
IH1025386 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Clinton G Wilson Wilson Heat & Air Inc
|
CAC057886 |
Class B A/c |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
|
Matt Forsyth |
12/12/2022 |
| Septic Release Inspection |
|
Health Dept |
12/13/2022 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Gary Pitzer |
1/31/2023 |
| Release to power company |
|
Gary Pitzer |
1/31/2023 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
1/31/2023 |