Permit Details

Permit Search

Permit

New Residential Construction

147 SW AMESBURY CT
LAKE CITY, FL 32024

Permit #
000046105
Application #
56956
Status Completed
  1. Submitted Oct 27, 2022
  2. Issued Dec 15, 2022
  3. Expires Jul 15, 2024
  4. Completed Jan 17, 2024

Property

Parcel #
03099-106
Owner
Gresham Sara Elizabeth,
Acres
0.50
Subdivision
Stonehenge Phase 1
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0293D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1762
Total Area (Sqft)
2519
Building Height
16
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0894
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified
  4. Point Review - On Hold-Incomplete
  5. Point Review - Printed-Online Application
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Documents Required
  9. Plan Review - Building Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Mechanical Approved
  12. Plan Review - Plumbing Approved
  13. Plan Review - Fuel/Gas Approved
  14. Plan Review - Reviewed
  15. Zoning Review - Reviewed
  16. Final Review - Documents Required
  17. Final Review - Documents Required
  18. Final Review - Documents Required
  19. Final Review - Reviewed
  20. Final Review - Payment Needed
  21. Permit Issued
  22. Final Review - Payment Needed

Contractors

  • Sara E Gresham

    John Norris Construction, Llc

    License
    CRC1331978
    Title
    Cert. Residential
    Role
    Contractor
  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Mary C Johnson

    Rcra Johnson Roofing,inc.

    License
    CCC1330073
    Title
    Roofing Contractor
    Role
    Subcontractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Jan R Touchton

    Touchton's Heating & Air Conditioning Inc

    License
    CAC058747
    Title
    Cert. A/c Class “a”
    Role
    Subcontractor

Inspections

  1. Jan 4, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Need Compaction Test

    Inspected by Matt Forsyth

  2. Jan 18, 2023

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  3. Jan 18, 2023

    Release to power company

    Inspected by Matt Forsyth

  4. Jan 19, 2023

    Passed: Building - Monolithic Slab

    Inspected by Matt Forsyth

  5. Jan 19, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Feb 21, 2023

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  7. Feb 21, 2023

    Passed: Building - Wall Sheathing

    Windstorm Sheathing

    Inspected by Matt Forsyth

  8. Apr 12, 2023

    Failed: Building - Framing

    No Attic Access

    Inspected by Matt Forsyth

  9. Apr 12, 2023

    Failed: Electrical - 2nd Rough-In

    Missing Smoke Det.in Hall

    Inspected by Matt Forsyth

  10. Apr 12, 2023

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  11. Apr 12, 2023

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tub Water Tested

    Inspected by Matt Forsyth

  12. Apr 12, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  13. Apr 13, 2023

    Passed: Electrical - 2nd Rough-In

    Item Addressed

    Inspected by Matt Forsyth

  14. Apr 14, 2023

    Passed: Building - Framing

    Inspected by Matt Forsyth

  15. May 11, 2023

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  16. Aug 8, 2023

    Passed: Electrical - Permanent Power

    Septic Needed

    Inspected by Matt Forsyth

  17. Aug 28, 2023

    Release to power company

    Inspected by Melissa Garber

  18. Aug 28, 2023

    Septic Release Inspection

    Inspected by Health Dept

  19. Jan 17, 2024

    Certificate-Release Certificate

    Inspected by Matt Forsyth

  20. Jan 17, 2024

    Passed: Building - Final

    Need Picture Of Cleanout Cap Condensate Line To Complete

    Inspected by Matt Forsyth

Documents