Permit Details

Permit Search

Permit

Roof Replacement or Repair

314 SW WILSHIRE DR
LAKE CITY, FL 32024

Permit #
000046048
Application #
57346
Status Completed
  1. Submitted Dec 6, 2022
  2. Issued Dec 6, 2022
  3. Expires Jun 14, 2023
  4. Completed Dec 16, 2022

Property

Parcel #
03023-387
Owner
Quinlan Raymond & Deborah L, Quinlan Deborah L As Co-trus
Acres
0.50
Subdivision
Callaway Unit 3
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0289D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Replace wood as needed
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
37
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL10124-R29
Product Manufacturer
GAF
Product Description
TIMBERLINE HDZ
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified
  4. Point Review - Processing
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Lewis G Walker

    Lewis Walker Roofing Inc

    License
    CCC1333551
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Dec 12, 2022

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Dec 16, 2022

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth