Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 1780 SW BETHLEHEM AVE
FORT WHITE, FL 32038
Parcel #: 09952-007
Acres: 9.98
Owner: Hagan Scott L, Hagan Michelle
Subdivision:
Zoning: A-3
Flood Zone: X
District: 2
Application #: 57103
Permit #: 000046034
Related Permit: Culvert Waiver: 000046035
Submitted: Thursday, November 10, 2022
Issued: Monday, December 5, 2022
Expires: Thursday, July 27, 2023
Completed: Thursday, July 27, 2023
Status: Completed
Septic Release? Yes
Notes:
MFE 1' ABOVE THE ROAD
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 1' ABOVE HIGHEST EXISTING GROUND ELEVATION
Fema map number 12023C0495C
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Stories 1
Heated Area (Sqft) 2071
Total Area (Sqft) 3163
Building Height 22
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 22-0923
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
11/23/2022 Plan Review - Corrections Needed
11/23/2022 Plan Review - Building Approved
11/23/2022 Plan Review - Electrical Approved
11/23/2022 Plan Review - Mechanical Approved
11/23/2022 Plan Review - Plumbing Approved
11/23/2022 Plan Review - Fuel/Gas Approved
11/23/2022 Plan Review - Reviewed
11/29/2022 Zoning Review - Reviewed
11/29/2022 Point Review - Reviewed
11/29/2022 Final Review - Documents Required
12/1/2022 Final Review - Reviewed
12/1/2022 Final Review - Payment Needed
12/5/2022 Permit Issued
Contractors
Name/ Business License Title Role
Mark Bauer
Gibraltar Contracting Llc
CBC1259633 Cert Building Contractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
Lewis G Walker
Lewis Walker Roofing Inc
CCC1333551 Cert. Roofing Subcontractor
Donald Davis
High Springs Electric Inc
EC0002306 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Anthony Aslan 12/8/2022
Passed: Engineering - Setbacks Anthony Aslan 12/8/2022
Failed: Building - Monolithic Slab Wrong Inspection Anthony Aslan 12/20/2022
Failed: Engineering - Setbacks Anthony Aslan 12/20/2022
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 12/22/2022
Cancelled: Building - Monolithic Slab Anthony Aslan 12/27/2022
Cancelled: Engineering - Setbacks Anthony Aslan 12/27/2022
Passed: Building - Slab Anthony Aslan 12/27/2022
Passed: Building - Roof Decking Anthony Aslan 1/19/2023
Passed: Building - Wall Sheathing Anthony Aslan 1/19/2023
Passed: Electrical - Temporary Service Anthony Aslan 1/30/2023
Release to power company Anthony Aslan 1/30/2023
Passed: Electrical - 2nd Rough-In Anthony Aslan 2/13/2023
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 2/13/2023
Failed: Mechanical - Rough In Masterbath Exhaust Duct Not Connected Anthony Aslan 2/13/2023
Passed: Building - Framing Anthony Aslan 2/13/2023
Passed: Mechanical - Rough In Corrected Anthony Aslan 2/14/2023
Passed: Building - Insulation Fix Pieces Blown Down Anthony Aslan 2/20/2023
Septic Release Inspection Health Dept 5/18/2023
Passed: Electrical - Permanent Power Anthony Aslan 5/26/2023
Release to power company Anthony Aslan 5/26/2023
Passed: Building - Final Need Fresh Air Automatic Damper Picture For Verification armoflex Not Uv Rated Anthony Aslan 7/6/2023
Certificate-Release Certificate Rec'vd Picture Anthony Aslan 7/27/2023
Documents
File Name Date File Size