Permit Details

Permit Search

Permit

New Residential Construction

127 NW TREELINE GLN
LAKE CITY, FL 32055

Permit #
000046033
Application #
57108
Status Completed
  1. Submitted Nov 11, 2022
  2. Issued Mar 28, 2023
  3. Expires Jun 17, 2024
  4. Completed Dec 20, 2023

Property

Parcel #
02049-151
Owner
Widergren Todd E, Widergren Shelia
Acres
5.47
Subdivision
Rolling Oaks
Zoning
A-3
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
This is the construction of a
Single Family Dwelling
Heated Area (Sqft)
560
Total Area (Sqft)
864
Stories
1
Building Height
14
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
180'
Septic# (00-0000) or (X00-000)
22-0934
Service Amps
200
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Documents Required
  9. Final Review - Documents Required
  10. Final Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued
  13. Final Review - Payment Needed
  14. Permit Reissued

Contractors

This is an owner-builder project.

  • Barry E Maxwell

    Max-well Built Llc

    License
    —
    Title
    Framing
    Role
    Subcontractor

    County License & Liability Insurance & Workers Comp Expired.

  • Barry E Maxwell

    Max-well Built Llc

    License
    —
    Title
    Framing
    Role
    Subcontractor

    County License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Dec 8, 2022

    Passed: Electrical - Temporary Service

    Receptacle Shall Be Ground Fault Protected

    Inspected by Matt Forsyth

  2. Dec 8, 2022

    Release to power company

    Inspected by Matt Forsyth

  3. Dec 13, 2022

    Passed: Building - Monolithic Slab

    Inspected by Matt Forsyth

  4. Dec 13, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Dec 19, 2022

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  6. Dec 19, 2022

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  7. Dec 21, 2022

    Cancelled: Building - Roof Decking

    Inspected by Matt Forsyth

  8. Dec 21, 2022

    Cancelled: Building - Strapping

    Inspected by Matt Forsyth

  9. Dec 21, 2022

    Cancelled: Building - Wall Sheathing

    Inspected by Matt Forsyth

  10. Dec 21, 2022

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  11. Dec 21, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  12. Dec 21, 2022

    Cancelled: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  13. Dec 21, 2022

    Passed: Building - Framing

    Inspected by Matt Forsyth

  14. Dec 30, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  15. Dec 30, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Dec 30, 2022

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  17. Jan 13, 2023

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  18. Feb 16, 2023

    Cancelled: Mechanical - Rough In

    Inspected by Troy Crews

  19. Feb 16, 2023

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  20. Feb 16, 2023

    Passed: Electrical - Permanent Power

    Need Septic Final

    Inspected by Troy Crews

  21. Feb 21, 2023

    Cancelled: Mechanical - Rough In

    Inspected by Matt Forsyth

  22. Feb 21, 2023

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  23. Feb 21, 2023

    Cancelled: Electrical - Permanent Power

    Inspected by Matt Forsyth

  24. Feb 22, 2023

    Cancelled: Building - Final

    Inspected by Matt Forsyth

  25. Feb 28, 2023

    Septic Release Inspection

    Inspected by Health Dept

  26. Aug 14, 2023

    Failed: Electrical - Permanent Power

    Need Electrical Panel Finished. Do Not See Meter Can Work

    Inspected by Matt Forsyth

  27. Dec 20, 2023

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  28. Dec 20, 2023

    Release to power company

    Inspected by Matt Forsyth

  29. Dec 20, 2023

    Passed: Building - Final

    Inspected by Matt Forsyth

  30. Requested

    Plumbing/Gas - 1st Underground Rough–In

    Awaiting inspection

Documents