Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
Need Toilet Onsite Before Further Inspections. |
Troy Crews |
12/7/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
12/7/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
1/20/2023 |
Passed: Building - Slab |
|
Troy Crews |
1/26/2023 |
Failed: Building - Roof Decking |
Nailing Of Roof Still In Progress, Lots Of Nails That Have Missed Roof Trusses (shiners) |
Gary Pitzer |
3/24/2023 |
Failed: Building - Wall Sheathing |
Nails Missing Outer Studs (shiners), All Nails Mixing Framing In Roof And Walls Need Removed |
Gary Pitzer |
3/24/2023 |
Passed: Building - Wall Sheathing |
|
Gary Pitzer |
3/29/2023 |
Passed: Building - Roof Decking |
|
Gary Pitzer |
3/29/2023 |
Failed: Plumbing/Gas - 2nd Rough-In |
Install Pro Plate That Is On Floor, Move Two Water Pipes Away From Edge Of Studs, Two Drains Out Of Walls? |
Gary Pitzer |
5/19/2023 |
Failed: Mechanical - Rough In |
Fireplace Chimney Incomplete, Vents Mashed(main Entry And Second Floor Bath And Bedroom), Also Before Finalexterior Linesets Will Need Proer Insulation |
Gary Pitzer |
5/19/2023 |
Failed: Electrical - 2nd Rough-In |
Missing Pro Plates,need Uf Cable Under Slab In Kitchen |
Gary Pitzer |
5/19/2023 |
Failed: Building - Framing |
Missing Nails In Hangersnear Stairs, Need Hangers On Floor Trusses In Closet,anchor Bolst In Several Locations |
Gary Pitzer |
5/19/2023 |
Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
5/25/2023 |
Failed: Mechanical - Rough In |
Items From Previous Inspection Still Needs Attention |
Gary Pitzer |
5/25/2023 |
Failed: Plumbing/Gas - 2nd Rough-In |
Items From Previous Inspection Still Required Attention |
Gary Pitzer |
5/25/2023 |
Failed: Building - Framing |
Pipe In Master Closet Needs Some Framing To Complete , This Has Not Changed Since Last Inspection |
Gary Pitzer |
5/25/2023 |
Passed: Mechanical - Rough In |
Exterior Line Set Must Have Proper Insulation On Final |
Troy Crews |
6/16/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
Wall Furred Out Nail Plates Installed |
Troy Crews |
6/16/2023 |
Passed: Building - Framing |
Pipes In Closet Corrdcted. |
Troy Crews |
6/16/2023 |
Failed: Building - Insulation |
Has Not Passed Framing Do Not Insulate |
Troy Crews |
6/20/2023 |
Building-Framing |
Framing Defects Corrected |
Gary Pitzer |
6/20/2023 |
Building-Insulation |
|
Gary Pitzer |
6/20/2023 |
Septic Release Inspection |
|
Health Dept |
7/19/2023 |
Passed: Electrical - Permanent Power |
Need Final Drive |
Gary Pitzer |
8/18/2023 |
Failed: Engineering - Final Driveway |
|
Smith, Blake |
8/21/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
8/24/2023 |
Passed: Electrical - Permanent Power |
Road Has Been Repaired |
Troy Crews |
8/24/2023 |
Release to power company |
|
Troy Crews |
8/24/2023 |
Failed: Building - Final |
1. Arc-fault Circuit Breakers Required On All Kitchen Counter Circuits, 2. Range Outlets Requires A Cover, 3. All Bathrooms Require Gfci Protection, 4. All Fans Should Operate On Rear Porch, 5. Handrail Required For Second Set Of Steps, 6. Hearth At Fireplace, 7. Engineer Letter For House Finish Floor And Road Elevation |
Gary Pitzer |
10/12/2023 |
Failed: Building - Final |
Hearth Not Complete |
Gary Pitzer |
10/13/2023 |
Passed: Building - Final |
|
Gary Pitzer |
10/16/2023 |
(Requested) Electrical -Permanent Power |
|
|
|