Mobile Home
Permit
| Application #: | 55063 |
| Permit #: |
000045968 |
| Related Permit: |
|
| Submitted: | Wednesday, June 1, 2022 |
| Issued: | Tuesday, November 22, 2022 |
| Expires: | Tuesday, March 21, 2023 |
| Completed: | Tuesday, March 21, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0490C |
| Mobile Home is a: |
Single Wide |
| Year Built |
1998 |
| Width (Ft.In) |
16 |
| Length (Ft.In) |
64 |
| Driveway access to home: |
Ft White |
| Installation Decal # |
43905 |
| Septic # |
21-0382 |
| Dev Permit # |
F023- |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
H153314g |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 6/1/2022 |
Point Review - Printed-Online Application |
| 6/1/2022 |
Point Review - Reviewed |
| 6/2/2022 |
Plan Review - Reviewed |
| 6/16/2022 |
Zoning Review - Documents Required |
| 6/17/2022 |
Zoning Review - Documents Required |
| 6/21/2022 |
Zoning Review - Documents Required |
| 6/23/2022 |
Zoning Review - Documents Required |
| 6/27/2022 |
Zoning Review - Documents Required |
| 6/30/2022 |
Zoning Review - Documents Required |
| 7/5/2022 |
Zoning Review - Documents Required |
| 7/8/2022 |
Zoning Review - Documents Required |
| 7/12/2022 |
Zoning Review - Documents Required |
| 10/7/2022 |
Zoning Review - Contact the Building Dept |
| 11/21/2022 |
Zoning Review - Reviewed |
| 11/21/2022 |
Final Review - Reviewed |
| 11/21/2022 |
Final Review - Payment Needed |
| 11/22/2022 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Brent M Strickland
|
IH1104218 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
Mobile Home In Fair Condition Drywall Missing In Ceiling In Some Places |
Matt Forsyth |
10/26/2022 |
| Septic Release Inspection |
|
Health Dept |
11/9/2022 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Not Complete With Set Up |
Matt Forsyth |
3/2/2023 |
| Failed: Engineering - Setbacks |
|
Matt Forsyth |
3/2/2023 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Matt Forsyth |
3/21/2023 |
| Release to power company |
|
Matt Forsyth |
3/21/2023 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
3/21/2023 |