Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
11/29/2022 |
Release to power company |
|
Matt Forsyth |
11/29/2022 |
Passed: Building - Footer |
|
Matt Forsyth |
12/6/2022 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
12/6/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Plumbing Only Underslab |
Gary Pitzer |
1/9/2023 |
Failed: Building - Slab |
Porches Do Not Have The Deepened Perimeter Slab Under Porch Edge With One Continuous Rebar |
Matt Forsyth |
1/11/2023 |
Passed: Building - Slab |
Item Addressed |
Matt Forsyth |
1/13/2023 |
Rescheduled 2/14/2023:Building - Masonry Wall Reinforcing |
|
Matt Forsyth |
2/10/2023 |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
2/15/2023 |
Cancelled: Engineering - Final Driveway |
|
Melissa Garber |
2/16/2023 |
Failed: Engineering - Final Driveway |
No Limerock For Top Cover |
Smith, Blake |
2/21/2023 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
2/28/2023 |
Passed: Building - Framing |
|
Matt Forsyth |
3/1/2023 |
Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
3/10/2023 |
Passed: Mechanical - Rough In |
|
Gary Pitzer |
3/10/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
3/13/2023 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
3/13/2023 |
Passed: Building - Insulation |
|
Matt Forsyth |
3/22/2023 |
Septic Release Inspection |
|
Health Dept |
5/18/2023 |
Failed: Electrical - Permanent Power |
Project Was Locked |
Matt Forsyth |
6/1/2023 |
Passed: Electrical - Permanent Power |
Need Driveway Release |
Matt Forsyth |
6/2/2023 |
Release to power company |
|
Melissa Garber |
6/6/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
6/6/2023 |
Passed: Building - Final |
Makeup Air Confirmed |
Matt Forsyth |
9/5/2023 |
(Requested) Building-Masonry Wall Reinforcing |
|
|
|