Permit Details

Permit Search

Permit

Mobile Home

1099 SW BOSTON TERRACE
FORT WHITE , FL 32038

Permit #
000045938
Application #
57008
Status Completed
  1. Submitted Nov 1, 2022
  2. Issued Nov 16, 2022
  3. Expires Oct 23, 2023
  4. Completed Apr 26, 2023

Property

Parcel #
00961-050
Owner
Dual Thumbs Holdings Llc
Acres
1.84
Subdivision
Three Rivers Estates Unit 17
Zoning
A-3
Flood zone
0.2 PCT ANNUAL CHANCE FLOOD HAZARD
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0467C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
1983
Width (Ft.In)
28
Length (Ft.In)
66
Driveway access to home:
Culvert Waiver
Installation Decal #
90867
Septic #
22-0870
Setbacks Front
30'
Setback Side 1
10'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
10'
Are you applying for a 5 year temporary permit?
No
Serial #
gdlcfl28836561ab
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Plan Review - Reviewed
  4. Zoning Review - Reviewed
  5. Final Review - Reviewed
  6. Final Review - Reviewed
  7. Permit Issued

Contractors

  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1025142
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Nov 10, 2022

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Wz2

    Inspected by Matt Forsyth

  2. Apr 17, 2023

    Failed: Mobile Home - Mobile Home Set-Up Final

    Bonding Of Frame Not Installed Properly, Working Bathroom (toilet Shower Etc)

    Inspected by Matt Forsyth

  3. Apr 17, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Apr 20, 2023

    Cancelled: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  5. Apr 20, 2023

    Cancelled: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Apr 24, 2023

    Septic Release Inspection

    Inspected by Health Dept

  7. Apr 26, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  8. Apr 26, 2023

    Release to power company

    Inspected by Matt Forsyth

  9. Apr 26, 2023

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth