Permit Details

Permit Search

Permit

New Residential Construction

264 SW FREEMAN GLN
LAKE CITY, FL 32024

Permit #
000045926
Application #
57010
Status Completed
  1. Submitted Nov 1, 2022
  2. Issued Nov 15, 2022
  3. Expires Nov 4, 2023
  4. Completed May 8, 2023

Property

Parcel #
03390-033
Owner
Freeman Samantha,
Acres
1.29
Subdivision
—
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0383D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2288
Total Area (Sqft)
3048
Building Height
16
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0896
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Sealed roof decking explanation for other option.
synthetic felt ( must be two layers or any other option above )

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Plan Review - Building Approved
  4. Plan Review - Electrical Approved
  5. Plan Review - Mechanical Approved
  6. Plan Review - Plumbing Approved
  7. Plan Review - Fuel/Gas Approved
  8. Plan Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued
  14. Final Review - Payment Needed

Contractors

This is an owner-builder project.

Inspections

  1. Nov 22, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  2. Nov 30, 2022

    Passed: Building - Monolithic Slab

    Inspected by Anthony Aslan

  3. Nov 30, 2022

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Dec 12, 2022

    Passed: Building - Footer

    Front Porch

    Inspected by Anthony Aslan

  5. Dec 12, 2022

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  6. Jan 6, 2023

    Passed: Building - Framing

    Roof Mailings Only

    Inspected by Gary Pitzer

  7. Feb 3, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Pressure Test On

    Inspected by Gary Pitzer

  8. Feb 3, 2023

    Passed: Building - Framing

    Inspected by Gary Pitzer

  9. Feb 3, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  10. Feb 7, 2023

    Cancelled: Building - Insulation

    Mistake

    Inspected by Gary Pitzer

  11. Feb 7, 2023

    Passed: Building - Insulation

    Walls Only , Ceilings Will Be Blown

    Inspected by Gary Pitzer

  12. Feb 7, 2023

    Cancelled: Building - Insulation

    Mistake

    Inspected by Gary Pitzer

  13. Feb 7, 2023

    Failed: Mechanical - Rough In

    Several Places That Straps And Or Other Ducts Have Ducts Collapsed

    Inspected by Gary Pitzer

  14. Feb 8, 2023

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  15. Feb 8, 2023

    Release to power company

    Inspected by Gary Pitzer

  16. Feb 8, 2023

    Passed: Mechanical - Rough In

    Inspected by Gary Pitzer

  17. Feb 14, 2023

    Septic Release Inspection

    Inspected by Health Dept

  18. May 8, 2023

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents