| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
Need Permit And Noc Posted |
Matt Forsyth |
12/14/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
12/14/2022 |
| Release to power company |
Changed From Sve To Clay |
Melissa Garber |
1/24/2023 |
| Passed: Electrical - Temporary Service |
|
Matt Forsyth |
1/24/2023 |
| Release to power company |
|
Matt Forsyth |
1/24/2023 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
3/3/2023 |
| Passed: Building - Slab |
|
Matt Forsyth |
3/14/2023 |
| Failed: Building - Lintel/Tie Beam |
Home Was Built Not To Plan Specifications Need Engineer Letter On Grout Below Finish Floor And Floating Floor Slab |
Matt Forsyth |
4/5/2023 |
| Cancelled: Building - Rated Assembly Fastening |
|
Matt Forsyth |
4/19/2023 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
4/19/2023 |
| Passed: Building - Framing |
|
Troy Crews |
6/20/2023 |
| Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
6/20/2023 |
| Passed: Mechanical - Rough In |
|
Troy Crews |
6/20/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/20/2023 |
| Passed: Building - Insulation |
Partial Ceiling Will Be Blown Insulation |
Matt Forsyth |
6/28/2023 |
| Failed: Electrical - Permanent Power |
Conduit Not Run Undergroundfor Service Septic Release Needed |
Matt Forsyth |
10/5/2023 |
| Passed: Electrical - Permanent Power |
Septic Needed |
Matt Forsyth |
10/18/2023 |
| Release to power company |
|
Melissa Garber |
10/23/2023 |
| Septic Release Inspection |
|
Health Dept |
10/23/2023 |
| Passed: Building - Final |
Ahu Missing Disconnect |
Anthony Aslan |
11/22/2023 |
| Certificate-Release Certificate |
Corretion Made |
Anthony Aslan |
11/30/2023 |