Permit Details

Permit Search

Permit

Mobile Home

988 SE BLACK CREEK CT
LULU, FL 32061

Permit #
000045903
Application #
57076
Status Completed
  1. Submitted Nov 8, 2022
  2. Issued Nov 14, 2022
  3. Expires Dec 13, 2023
  4. Completed Jun 16, 2023

Property

Parcel #
10659-200
Owner
Allen Ronald H Trustee Of The
Acres
57.02
Subdivision
—
Zoning
ESA-2
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0430C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2022
Width (Ft.In)
32
Length (Ft.In)
66
Driveway access to home:
Private Drive
Installation Decal #
88864
Septic #
22-0911
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
DVAL12310716AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • Ernest S Johnson

    Dependable Mobile Home Service

    License
    IH1025249
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Contractor

Inspections

  1. May 16, 2023

    Septic Release Inspection

    Inspected by Health Dept

  2. Jun 16, 2023

    Failed: Mobile Home - Mobile Home Set-Up Final

    No Access Gate Locked, Spoke With Owner Busy, Waited At Gate 3mins Other Inspections To Do

    Inspected by Anthony Aslan

  3. Jun 16, 2023

    Failed: Engineering - Setbacks

    Inspected by Anthony Aslan

  4. Jun 16, 2023

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  5. Jun 16, 2023

    Release to power company

    Inspected by Troy Crews

  6. Jun 16, 2023

    Passed: Engineering - Setbacks

    Inspected by Troy Crews