Permit Details

Permit Search

Permit

New Residential Construction

161 SW WINTHROP PL
FORT WHITE, FL 32038

Permit #
000045859
Application #
56457
Status Completed
  1. Submitted Sep 14, 2022
  2. Issued Nov 7, 2022
  3. Expires Nov 12, 2024
  4. Completed May 16, 2024

Property

Parcel #
03832-221
Owner
Kremser Scott, Kremser Tara
Acres
10.95
Subdivision
Spring Run Unr Phase 1
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0480C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1608
Total Area (Sqft)
2472
Building Height
30
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0879
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Documents Required
  5. Plan Review - Documents Required
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Building Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Mechanical Approved
  11. Plan Review - Plumbing Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Documents Required
  14. Zoning Review - Reviewed
  15. Final Review - Reviewed
  16. Final Review - Reviewed
  17. Final Review - Payment Needed
  18. Permit Issued

Contractors

No contractors are listed on this permit.

Inspections

  1. Nov 9, 2022

    Septic Release Inspection

    Inspected by Health Dept

  2. Dec 5, 2022

    Cancelled: Building - Footer

    Inspected by Emaleigh Williams

  3. Dec 5, 2022

    Cancelled: Engineering - Setbacks

    Inspected by Emaleigh Williams

  4. Dec 7, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  5. Dec 7, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  6. Jan 11, 2023

    Passed: Building - Lintel/Tie Beam

    Inspected by Matt Forsyth

  7. Jan 11, 2023

    Passed: Building - Vertical Cells/Columns

    Inspected by Matt Forsyth

  8. Jan 11, 2023

    Cancelled: Building - Lintel/Tie Beam

    Inspected by Matt Forsyth

  9. Jan 11, 2023

    Cancelled: Building - Vertical Cells/Columns

    Inspected by Matt Forsyth

  10. Feb 9, 2023

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Melissa Garber

  11. Feb 9, 2023

    Cancelled: Building - Framing

    Inspected by Melissa Garber

  12. Feb 9, 2023

    Cancelled: Building - Roof Decking

    Inspected by Melissa Garber

  13. Feb 9, 2023

    Cancelled: Building - Strapping

    Inspected by Melissa Garber

  14. Feb 9, 2023

    Cancelled: Building - Wall Sheathing

    Inspected by Melissa Garber

  15. Feb 13, 2023

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  16. Feb 13, 2023

    Passed: Building - Rated Assembly Fastening

    Inspected by Matt Forsyth

  17. Feb 13, 2023

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  18. Feb 13, 2023

    Passed: Building - Strapping

    Inspected by Matt Forsyth

  19. Feb 13, 2023

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  20. Feb 14, 2023

    Cancelled: Building - Roof Decking

    Inspected by Matt Forsyth

  21. Feb 14, 2023

    Cancelled: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  22. Feb 14, 2023

    Cancelled: Building - Strapping

    Inspected by Matt Forsyth

  23. Feb 14, 2023

    Cancelled: Building - Wall Sheathing

    Inspected by Matt Forsyth

  24. Feb 14, 2023

    Passed: Building - Framing

    Inspected by Matt Forsyth

  25. Mar 6, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  26. Mar 6, 2023

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  27. Mar 6, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  28. Apr 4, 2023

    Cancelled: Building - Roof Decking

    Inspected by Matt Forsyth

  29. May 30, 2023

    Passed: Mechanical - Rough In

    Need Gasket On Boots Will Check At Electric Inspection

    Inspected by Matt Forsyth

  30. Sep 15, 2023

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Matt Forsyth

  31. Sep 15, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  32. Oct 4, 2023

    Rescheduled 10/9/2023:Building - Insulation

    Inspected by Matt Forsyth

  33. Oct 9, 2023

    Cancelled: Building - Insulation

    Inspected by Bnztemp

  34. Oct 16, 2023

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  35. Jan 22, 2024

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  36. Jan 22, 2024

    Release to power company

    Inspected by Matt Forsyth

  37. May 16, 2024

    Passed: Building - Final

    Inspected by Matt Forsyth