Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
10/21/2022 |
Passed: Building - Footer |
|
Matt Forsyth |
10/24/2022 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/24/2022 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
10/24/2022 |
Release to power company |
|
Matt Forsyth |
10/24/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Water Test Should Be Taken At The Highest End Of Fixtures Served |
Matt Forsyth |
11/15/2022 |
Passed: Building - Slab |
House Only. |
Troy Crews |
11/22/2022 |
Passed: Building - Monolithic Slab |
This Completes The Finish Floor Area Of Home |
Matt Forsyth |
12/7/2022 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
12/7/2022 |
Passed: Building - Vertical Cells/Columns |
|
Matt Forsyth |
12/19/2022 |
Failed: Building - Roof Decking |
Shiners Need To Be Backed Out And Re Nailed |
Matt Forsyth |
1/5/2023 |
Failed: Building - Wall Sheathing |
Shiners Need To Be Removed |
Matt Forsyth |
1/5/2023 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
1/6/2023 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
1/6/2023 |
Passed: Building - Framing |
Exterior Openings Meaning Doors Have Not Been Installed |
Matt Forsyth |
2/1/2023 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
2/1/2023 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
2/1/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
Tub Water Tested |
Matt Forsyth |
2/1/2023 |
Passed: Building - Insulation |
Safety Railing Needed On Bonus Floor |
Matt Forsyth |
2/9/2023 |
Passed: Electrical - Permanent Power |
Need Septic And Driveway |
Matt Forsyth |
4/17/2023 |
Septic Release Inspection |
Need Final Drive-- Rec'd |
Health Dept |
4/17/2023 |
Release to power company |
|
Melissa Garber |
4/20/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/20/2023 |
Passed: Building - Final |
|
Matt Forsyth |
6/16/2023 |