| Inspection |
Notes |
Performed By |
Date |
| Cancelled: Building - Footer |
|
Matt Forsyth |
10/25/2022 |
| Cancelled: Engineering - Setbacks |
|
Matt Forsyth |
10/25/2022 |
| Passed: Building - Footer |
|
Matt Forsyth |
10/25/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/25/2022 |
| Failed: Electrical - Temporary Service |
No Temporary Service Has Been Built |
Matt Forsyth |
10/25/2022 |
| Passed: Electrical - Temporary Service |
|
Matt Forsyth |
11/16/2022 |
| Release to power company |
|
Matt Forsyth |
11/16/2022 |
| Passed: Building - Slab |
Under Slab Plumbing Drains Only |
Gary Pitzer |
1/3/2023 |
| Passed: Building - Slab |
Plastic Down And Sealed, No Steel Or Wire Possibly Fiber Concrete? |
Gary Pitzer |
1/11/2023 |
| Passed: Building - Lintel/Tie Beam |
|
Matt Forsyth |
3/9/2023 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
3/27/2023 |
| Passed: Building - Ext Strapping/Wall Sheathing |
Straps From Top Of Block Wall Around Trusses |
Gary Pitzer |
5/31/2023 |
| Passed: Building - Roof Decking |
|
Gary Pitzer |
5/31/2023 |
| Failed: Building - Framing |
Attic Access Location, Chase For Dryer Vent And Vent Has Broken Fitting That Will Require Replacement, Finish Framing Around Ducts In Garage, 1 Hip Truss In Garage Area Needs End Attached, Several Unused Holes Ans Around Pipes And Wires Need Draft Stopped |
Gary Pitzer |
5/31/2023 |
| Electrical -2nd Rough-In |
Walls And Ceiling |
Gary Pitzer |
6/9/2023 |
| Plumbing/Gas-2nd Rough-In |
+50 Psi Water Lines , Vents Complete |
Gary Pitzer |
6/9/2023 |
| Passed: Mechanical - Rough In |
|
Gary Pitzer |
6/9/2023 |
| Passed: Building - Framing |
|
Gary Pitzer |
6/9/2023 |
| Building-Insulation |
|
Gary Pitzer |
6/16/2023 |
| Septic Release Inspection |
|
Health Dept |
7/19/2023 |
| Passed: Electrical - Permanent Power |
|
Gary Pitzer |
10/3/2023 |
| Release to power company |
|
Gary Pitzer |
10/3/2023 |
| Passed: Building - Final |
|
Gary Pitzer |
11/21/2023 |