Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/30/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/14/2022 |
Cancelled: Building - Monolithic Slab |
|
Troy Crews |
10/17/2022 |
Cancelled: Engineering - Setbacks |
|
Troy Crews |
10/17/2022 |
Cancelled: Building - Slab |
|
Troy Crews |
10/17/2022 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
10/18/2022 |
Passed: Building - Monolithic Slab |
|
Anthony Aslan |
10/18/2022 |
Failed: Building - Ext Strapping/Wall Sheathing |
No Porch Posts Installed |
Anthony Aslan |
11/1/2022 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
11/1/2022 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
11/1/2022 |
Cancelled: Building - Strapping |
|
Anthony Aslan |
11/22/2022 |
Passed: Building - Strapping |
|
Anthony Aslan |
11/29/2022 |
Passed: Building - Framing |
No Windows Or Doors Installed, Do Not Insulate. |
Anthony Aslan |
11/29/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
11/29/2022 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
11/29/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
11/29/2022 |
Passed: Building - Insulation |
Ceilings Only |
Anthony Aslan |
12/12/2022 |
Passed: Electrical - Permanent Power |
Need Septic Release, Panel Cover Installed, Switches Front Door Missing Cover Plate |
Anthony Aslan |
1/18/2023 |
Release to power company |
|
Melissa Garber |
1/26/2023 |
Septic Release Inspection |
|
Health Dept |
1/26/2023 |
Rescheduled 3/17/2023:Building - Final |
|
Anthony Aslan |
3/16/2023 |
Passed: Building - Final |
Need Driveway Release |
Anthony Aslan |
3/17/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
3/21/2023 |
Certificate-Release Certificate |
Rec'd Final Drive Release |
Anthony Aslan |
3/22/2023 |