Mobile Home
Permit
| Application #: | 55728 |
| Permit #: |
000045574 |
| Related Permit: |
|
| Submitted: | Monday, August 29, 2022 |
| Issued: | Tuesday, September 27, 2022 |
| Expires: | Tuesday, December 6, 2022 |
| Completed: | Tuesday, December 6, 2022 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0285D |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
1986 |
| Width (Ft.In) |
24 |
| Length (Ft.In) |
56 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
91571 |
| Septic # |
x-city |
| Setbacks Front |
25' |
| Setback Side 1 |
10' |
| Setbacks Rear |
15' |
| Dev Permit # |
F023- |
| Setback Side 2 |
10' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
0m8245ab |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 7/15/2022 |
Application pending. |
| 8/29/2022 |
City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER, LC_SEWER. |
| 8/29/2022 |
Point Review - Printed-Online Application |
| 8/29/2022 |
Point Review - Reviewed |
| 9/16/2022 |
Plan Review - Reviewed |
| 9/20/2022 |
Zoning Review - Reviewed |
| 9/21/2022 |
Final Review - Documents Required |
| 9/26/2022 |
Final Review - Reviewed |
| 9/26/2022 |
Final Review - Payment Needed |
| 9/27/2022 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Freeman Pigott Pigotts Mobile Home Sales And Services
County License & State License Expired. |
IH1025147 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
Under Pinning Needs To Be Fix & Flooring |
Anthony Aslan |
10/11/2022 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Sump Pump Not Connected To Sewer, A/c Ducts On Ground Need To Be Strapped, Insulation Under Trailer Not Fixed., Didn't See Power Connection |
Anthony Aslan |
12/2/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
12/2/2022 |
| Mobile Home-Mobile Home Set-Up Final |
|
Troy Crews |
12/6/2022 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Troy Crews |
12/6/2022 |
| Release to power company |
|
Troy Crews |
12/6/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
12/6/2022 |