Permit Details

Permit Search

Permit

New Residential Construction

566 SW MEADOW WOOD
LAKE CITY, FL 32024

Permit #
000045570
Application #
55665
Status Completed
  1. Submitted Jul 26, 2022
  2. Issued Sep 27, 2022
  3. Expires Jan 2, 2024
  4. Completed Jul 6, 2023

Property

Parcel #
00276-107
Owner
Gomez David, Gomez Nancy
Acres
5.01
Subdivision
Meadow Wood
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
SHALL BE THE HIGHER OF: EL. 163' OR 8" ABOVE HIGHEST ADJACENT GRADE
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0270C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2926
Total Area (Sqft)
4130
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0655
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Documents Required
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued
  14. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Construction Inc

    License
    CBC054575
    Title
    Cert.building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Oct 6, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Oct 6, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Oct 13, 2022

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  4. Oct 13, 2022

    Release to power company

    Inspected by Matt Forsyth

  5. Nov 18, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Island Electrical Conduit Run

    Inspected by Matt Forsyth

  6. Nov 23, 2022

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Dec 7, 2022

    Passed: Building - Monolithic Slab

    Completes Floor Area

    Inspected by Matt Forsyth

  8. Dec 7, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  9. Jan 13, 2023

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. Jan 13, 2023

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  11. Feb 17, 2023

    Passed: Building - Framing

    Inspected by Troy Crews

  12. Feb 17, 2023

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  13. Feb 17, 2023

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  14. Feb 17, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    20 Psi On Gas Lines

    Inspected by Troy Crews

  15. Mar 3, 2023

    Passed: Building - Insulation

    Spray Foam

    Inspected by Matt Forsyth

  16. May 8, 2023

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  17. May 8, 2023

    Release to power company

    Inspected by Matt Forsyth

  18. May 18, 2023

    Septic Release Inspection

    Inspected by Health Dept

  19. Jul 6, 2023

    Passed: Building - Final

    Lane Hvac Was Contacted To Confirm Mechanical Ventilation, Blower Door Came In At 1.54

    Inspected by Matt Forsyth

  20. Jul 6, 2023

    Passed: Building - Final

    Item Addressed

    Inspected by Matt Forsyth