Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/30/2022 |
Passed: Building - Footer |
|
Troy Crews |
10/4/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/4/2022 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
11/7/2022 |
Release to power company |
|
Troy Crews |
11/7/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
11/7/2022 |
Passed: Building - Slab |
|
Troy Crews |
11/15/2022 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
1/6/2023 |
Failed: Building - Framing |
T -13 Truss Broken Need Truss Repair From Truss Company And Repair Accordingly, Also Need Confirmation Of Straps On Garage Headers May Have To Remove Buck Boards. |
Troy Crews |
1/6/2023 |
Passed: Building - Roof Decking |
|
Troy Crews |
1/6/2023 |
Passed: Building - Framing |
|
Troy Crews |
2/1/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
2/1/2023 |
Passed: Mechanical - Rough In |
|
Troy Crews |
2/1/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
2/1/2023 |
Failed: Building - Insulation |
No Wall Insulation |
Anthony Aslan |
2/9/2023 |
Passed: Building - Insulation |
|
Troy Crews |
2/13/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/11/2023 |
Passed: Electrical - Permanent Power |
Need Septic Final, Also Get Front Door Lock Installed. |
Troy Crews |
4/13/2023 |
Septic Release Inspection |
|
Health Dept |
4/17/2023 |
Release to power company |
|
Melissa Garber |
4/18/2023 |
Failed: Building - Final |
Step In Garage 9 Inches 7.75 Max |
Troy Crews |
5/8/2023 |
Passed: Building - Pre-Certificate Public Works Inspection |
|
Gary Pitzer |
5/16/2023 |
Passed: Building - Final |
|
Gary Pitzer |
5/16/2023 |