Permit Details

Permit Search

Permit

Roof Replacement or Repair

339 SW BLACKPINE TER
LAKE CITY, FL 32024

Permit #
000045477
Application #
56385
Status Completed
  1. Submitted Sep 13, 2022
  2. Issued Sep 21, 2022
  3. Expires Mar 27, 2023
  4. Completed Sep 28, 2022

Property

Parcel #
03000-146
Owner
Rossborough Forrest Wayne &, Rossborough Marilyn K
Acres
1.43
Subdivision
—
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0289D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
REPLACE WOOD AS NEEDED. 11 SQ GARAGE WILL BE DONE AS WELL SOLD @ $3995.00
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
63
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
Fl10124-R29
Product Manufacturer
GAF
Product Description
TIMBERLINE HDZ
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. City of Lake City
  3. Point Review - Processing
  4. Final Review - Documents Required
  5. Final Review - Payment Needed
  6. Permit Issued
  7. Permit Reissued

Contractors

  • Lewis G Walker

    Lewis Walker Roofing Inc

    License
    CCC1333551
    Title
    Cert. Roofing
    Role
    Contractor

Inspections

  1. Sep 20, 2022

    Failed: Re-Roof - In Progress

    Nonwork Being Done, Also Need Address

    Inspected by Troy Crews

  2. Sep 20, 2022

    Cancelled: Re-Roof - In Progress

    Rescheduled

    Inspected by Emaleigh Williams

  3. Sep 20, 2022

    Passed: Re-Roof - In Progress

    Roof Already Done

    Inspected by Troy Crews

  4. Sep 21, 2022

    Passed: Re-Roof - In Progress

    Need Affadavit And Pics For Final

    Inspected by Matt Forsyth

  5. Sep 28, 2022

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth