Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Storage Building Permit

Address 161 SW RIVER OAK CT
FORT WHITE, FL 32038
Parcel #: 04137-011
Acres: 4.73
Owner: Driggers Christopher W, Driggers Marian L
Subdivision: River Oaks Estates Unr
Zoning: A-3
Flood Zone: X
District: 2
Application #: 56363
Permit #: 000045445
Related Permit:
Submitted: Tuesday, September 6, 2022
Issued: Wednesday, October 11, 2023
Expires: Thursday, December 28, 2023
Completed: Thursday, December 28, 2023
Status: Completed
Septic Release? Yes
Notes:
NON HABITABLE STRUCTURE NEW SLAB, NO MECHANICAL OR PLUMBING ELECTRICAL TO BE INCLUDED
Job Details
Elevation regulation Accessory Use
Finished floor requirement Non-Habitable Structure
Fema map number 12023C0490C
In floodway N
Type of Structure Other
Commercial or Residential? Residential
Total Area (Sqft) 1500
Septic# (00-0000) or (X00-000) x22-147
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setback Rear 25'
Building Code Construction Type III
Building Code Element B
Building Code Occupancy Types Storage
Occupancy Use Title storage
Dev Permit # F023-
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Building Height 16
Length 30
Width 50
Service Amps 200
Review Notes
9/6/2022 Point Review - Received-Hard Copy Application
9/8/2022 Plan Review - Reviewed
9/8/2022 Zoning Review - Reviewed
9/9/2022 Final Review - Documents Required NEEDED ENVIROMENTAL HEALTH RELEASE
9/9/2022 Final Review - Corrections Needed NEEDED: STAFF: THERE WAS AN X NUMBER GIVEN- STATED ON APPLICATION *ANY MEP? *NEW SLAB, EXISTING SLAB, OR NO SLAB?
9/13/2022 Final Review - Reviewed
9/13/2022 Final Review - Payment Needed
9/14/2022 Permit Issued Permit #000045445 created and approved.
10/6/2022 Final Review - Payment Needed
10/11/2023 Permit Reissued Permit reissued to reflect updated information.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 9/16/2022
Rescheduled 3/3/2023:Building - Vertical Cells/Columns Matt Forsyth 3/2/2023
Failed: Building - Vertical Cells/Columns No Access To Project Matt Forsyth 3/3/2023
Passed: Building - Footer Matt Forsyth 3/6/2023
Passed: Engineering - Setbacks Matt Forsyth 3/6/2023
Passed: Building - Footer Footers Are Complete Matt Forsyth 5/9/2023
Passed: Engineering - Setbacks Matt Forsyth 5/9/2023
Passed: Building - Framing Pole Barn Structure Itself No Build Out At This Time Matt Forsyth 5/9/2023
Passed: Building - Slab 4"slab No Steel Matt Forsyth 5/15/2023
Cancelled: Building - Framing Matt Forsyth 8/3/2023
Failed: Building - Ext Strapping/Wall Sheathing Walls For Sheathing (metal)need Horizontal Girts At 2feet On Center Matt Forsyth 8/3/2023
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 12/28/2023
Passed: Electrical - 1st Underground Rough–In Matt Forsyth 12/28/2023
Passed: Building - Final Matt Forsyth 12/28/2023
Passed: Electrical - Permanent Power Matt Forsyth 12/28/2023
Release to power company Matt Forsyth 12/28/2023
Documents
File Name Date File Size
Documentation 20210623 033647.pdf 2025.07.04 3.77MB