Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 1585 SW COUNTY ROAD 252B
LAKE CITY, FL 32024
Parcel #: 02851-002
Acres: 3.45
Owner: Thomas Steven Parker, Thomas Tracy Ynatte
Subdivision:
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 56116
Permit #: 000045409
Related Permit:
Submitted: Wednesday, August 17, 2022
Issued: Monday, September 12, 2022
Expires: Monday, September 25, 2023
Completed: Monday, September 25, 2023
Status: Completed
Septic Release? Yes
Notes:
*LAKE CITY UTLITY CUSTOMER SERVICE NOTES *THE CITY OF LAKE CITY PROVIDES WATER SERVICE TO THIS AREA. A TAP APPLICATION WOULD NEED TO BE SUBMITTED IF THEY ARE CONNECTING TO CITY WATER. TAP FEES, IMPACT FEES AND UTILITY DEPOSITS ARE REQUIRED TO CONNECT TO CITY UTILITIES. *EXISTING MOBILE HOME TO BE REMOVD WITHIN 45 OF C/O
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0290D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1391
Total Area (Sqft) 2099
Building Height 17
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 22-0646
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
8/17/2022 Application pending.
8/17/2022 City of Lake City Utilities Notified
8/19/2022 Point Review - Printed-Online Application
8/19/2022 Point Review - Reviewed
8/31/2022 Plan Review - Documents Required
9/2/2022 Plan Review - Building Approved
9/2/2022 Plan Review - Electrical Approved
9/2/2022 Plan Review - Mechanical Approved
9/2/2022 Plan Review - Plumbing Approved
9/2/2022 Plan Review - Reviewed
9/6/2022 Zoning Review - Reviewed
9/7/2022 Final Review - Documents Required
9/7/2022 Final Review - Reviewed
9/7/2022 Final Review - Payment Needed
9/12/2022 Permit Issued
Contractors
Name/ Business License Title Role
Sara E Gresham
John Norris Construction, Llc
CRC1331978 Cert. Residential Contractor
Don C Bills Sr
Hometown Plumbing Services Llc
CFC1428890 Plumbing Contractor Subcontractor
Mary C Johnson
Rcra Johnson Roofing,inc.
CCC1330073 Roofing Contractor Subcontractor
Donald R Hollingsworth
Holly Electric Inc
EC13005429 Electrical Subcontractor
Jan R Touchton
Touchton's Heating & Air Conditioning Inc
CAC058747 Cert. A/c Class “a” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Matt Forsyth 9/23/2022
Passed: Engineering - Setbacks Matt Forsyth 9/23/2022
Passed: Plumbing/Gas - 1st Underground Rough–In Waste Pipe Only Matt Forsyth 11/3/2022
Rescheduled 11/23/2022:Building - Slab Matt Forsyth 11/17/2022
Passed: Building - Slab Pictures Sent To Matt Troy Crews 11/22/2022
Passed: Building - Roof Decking Matt Forsyth 12/14/2022
Passed: Building - Wall Sheathing Matt Forsyth 12/14/2022
Passed: Building - Framing Matt Forsyth 2/1/2023
Passed: Electrical - 2nd Rough-In Matt Forsyth 2/1/2023
Passed: Mechanical - Rough In Matt Forsyth 2/1/2023
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 2/1/2023
Passed: Plumbing/Gas - Tub Set/Shower Pan Tub Water Tested Matt Forsyth 2/1/2023
Passed: Building - Footer Matt Forsyth 2/10/2023
Passed: Engineering - Setbacks Matt Forsyth 2/10/2023
Passed: Building - Insulation Matt Forsyth 3/3/2023
Septic Release Inspection Health Dept 6/15/2023
Passed: Electrical - Permanent Power Disconnect Needed For Air Conditioning Handler Matt Forsyth 6/29/2023
Release to power company Matt Forsyth 6/29/2023
Passed: Building - Final Matt Forsyth 9/25/2023
Documents
File Name Date File Size