8/17/2022
|
Application pending.
|
8/19/2022
|
Point Review - Printed-Online Application
NEEDED
* ENVIROMENTAL HEALTH RELEASE
* SERIAL #
|
8/19/2022
|
Point Review - Reviewed
NEEDED
* ENVIROMENTAL HEALTH RELEASE
* SERIAL #
|
8/22/2022
|
Plan Review - Reviewed
NEEDED
* ENVIROMENTAL HEALTH RELEASE
* SERIAL #
|
8/23/2022
|
Zoning Review - Reviewed
NEEDED
* ENVIROMENTAL HEALTH RELEASE
* SERIAL #
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR
ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
8/23/2022
|
Final Review - Documents Required
NEEDED
* ENVIROMENTAL HEALTH RELEASE
* SERIAL #
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR
ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
8/25/2022
|
Final Review - Documents Required
NEEDED
* ENVIROMENTAL HEALTH RELEASE
* SERIAL #
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR
ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
9/6/2022
|
Final Review - Reviewed
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR
ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
9/6/2022
|
Final Review - Payment Needed
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR
ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
|
9/6/2022
|
Permit Issued
Permit #000045375 created and approved.
|