Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/2/2022 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
9/13/2022 |
Passed: Building - Footer |
No Porta Potty |
Anthony Aslan |
9/13/2022 |
Rescheduled 10/17/2022:Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
10/14/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/17/2022 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
10/17/2022 |
Release to power company |
|
Anthony Aslan |
10/17/2022 |
Passed: Electrical - 1st Underground Rough–In |
|
Anthony Aslan |
10/17/2022 |
Passed: Building - Slab |
|
Anthony Aslan |
10/19/2022 |
Failed: Building - Framing |
Need Letter From Architect On Strapping Porch Post Both Porches, Sdd Girder Tie Downs In Garage. |
Troy Crews |
1/13/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
1/13/2023 |
Failed: Mechanical - Rough In |
Bath Ducts Need Attatchment. |
Troy Crews |
1/13/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
1/13/2023 |
Failed: Building - Insulation |
Not Complete |
Anthony Aslan |
1/30/2023 |
Passed: Building - Framing |
Rods Installed In Garage |
Anthony Aslan |
1/30/2023 |
Passed: Mechanical - Rough In |
Fan Connected |
Anthony Aslan |
1/30/2023 |
Passed: Building - Insulation |
|
Troy Crews |
2/1/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
3/24/2023 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
3/27/2023 |
Release to power company |
|
Melissa Garber |
3/30/2023 |
Septic Release Inspection |
|
Health Dept |
3/30/2023 |
Failed: Building - Final |
-no Access
-no Permit For Detached Garage |
Anthony Aslan |
5/3/2023 |
Passed: Building - Final |
Need Paper Work And Application For Detached Garage |
Anthony Aslan |
5/4/2023 |
Certificate-Release Certificate |
|
Anthony Aslan |
5/16/2023 |