Permit Details

Permit Search

Permit

Mobile Home

717 SW NAUTILUS RD
LAKE CITY, FL 32024

Permit #
000045318
Application #
56154
Status Completed
  1. Submitted Aug 19, 2022
  2. Issued Aug 29, 2022
  3. Expires Apr 23, 2023
  4. Completed Oct 27, 2022

Property

Parcel #
09284-010
Owner
Jerry Dessaria Cole
Acres
5.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0395C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2022
Width (Ft.In)
32
Length (Ft.In)
76
Driveway access to home:
Culvert Permit
Installation Decal #
90263
Septic #
22-0509
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA10022708AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Corrections Needed
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • David Albright

    David Albright Mobile Home Svc Llc

    License
    IH1129420
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ronald E Bonds Sr

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Oct 25, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Final

    Inspected by Troy Crews

  2. Oct 25, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Oct 27, 2022

    Release to power company

    Inspected by Melissa Garber

  4. Oct 27, 2022

    Certificate-Release Certificate

    Inspected by Troy Crews

  5. Oct 27, 2022

    Septic Release Inspection

    Inspected by Health Dept