Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Additions Permit

Address 726 NW CLUBVIEW CIR
LAKE CITY, FL 32055
Parcel #: 02346-020
Acres: 0.47
Owner: Patel Janak, Atel Bhavnabahen
Subdivision: Club View Park S/d
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 55818
Permit #: 000045243
Related Permit:
Submitted: Monday, July 25, 2022
Issued: Monday, August 22, 2022
Expires: Tuesday, May 2, 2023
Completed: Tuesday, May 2, 2023
Status: Completed
Septic Release? No
Notes:
LAKE CITY UTLITY CUSTOMER SERVICE NOTES THE CITY OF LAKE CITY PROVIDES WATER TO THIS LOCATION. THE UTILITY ACCOUNT IS ACTIVE. *REMODEL OF EXISTING FOOTPRINT OF HOUSE
Job Details
Finished floor requirement
Fema map number 12023C0280D
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 5700
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Explain if not removing the existing roofing material? Metal Roof Over 1x4 Purlins
Type of New Roofing Product Metal
Florida Product Approval Number FL17992
Product Manufacturer Capital Metal
Product Description 26 GA RIB METAL
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. Metal Roof Over 1x4 Purlins
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
7/25/2022 Application pending.
7/25/2022 City of Lake City Utilities Notified
7/25/2022 Point Review - Processing
7/27/2022 Point Review - Printed-Online Application
8/8/2022 Plan Review - Corrections Needed
8/10/2022 Plan Review - Building Approved
8/10/2022 Plan Review - Electrical Approved
8/10/2022 Plan Review - Mechanical Approved
8/10/2022 Plan Review - Plumbing Approved
8/10/2022 Plan Review - Fuel/Gas Approved
8/10/2022 Plan Review - Reviewed
8/11/2022 Zoning Review - Reviewed
8/12/2022 Final Review - Documents Required
8/12/2022 Application Converted
8/12/2022 Final Review - Documents Required
8/22/2022 Final Review - Payment Needed
8/22/2022 Permit Issued
Contractors
Name/ Business License Title Role
Leslie R Mcdaniel
Reed Mcdaniel Construction Inc
CBC1255787 Cert. Building Contractor
Donald Davis
High Springs Electric Inc
EC0002306 Electrical Contractor Subcontractor
Richard M Touchstone
Touchstone Heating & Air Inc
Liability Insurance & Workers Comp Expired.
CAC058099 Class B A/c Contractor Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Paul R Mcdaniel
Reed Mcdaniel Construction Inc Dba Reed Roofing
CCC1330719 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Matt Forsyth 9/14/2022
Passed: Engineering - Setbacks Matt Forsyth 9/14/2022
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 10/10/2022
Cancelled: Building - Slab Matt Forsyth 10/11/2022
Passed: Building - Slab Fiber Mesh Concrete Matt Forsyth 10/13/2022
Passed: Building - Roof Decking Anthony Aslan 11/8/2022
Passed: Building - Wall Sheathing Anthony Aslan 11/8/2022
Passed: Building - Lath/Stucco Fasteners Inspected Matt Forsyth 12/6/2022
Passed: Electrical - 1st Underground Rough–In This Inspection Should Be Recorded As A Second Rough Matt Forsyth 12/20/2022
Passed: Mechanical - Rough In Matt Forsyth 12/20/2022
Passed: Plumbing/Gas - 1st Underground Rough–In This Inspection Should Be Recorded As A Plumbing Gas Second Rough Matt Forsyth 12/20/2022
Passed: Building - Framing Need Simpson Screws At Top Of Post On Porch Matt Forsyth 12/29/2022
Passed: Building - Insulation Matt Forsyth 1/12/2023
Rescheduled 5/1/2023:Building - Final Matt Forsyth 4/28/2023
Cancelled: Building - Final Melissa Garber 5/1/2023
Passed: Building - Final Matt Forsyth 5/2/2023
Documents
File Name Date File Size