| Inspection |
Notes |
Performed By |
Date |
| Passed: Electrical - Temporary Service |
|
Troy Crews |
9/15/2022 |
| Release to power company |
|
Troy Crews |
9/15/2022 |
| Passed: Building - Footer |
|
Anthony Aslan |
9/19/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
9/19/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
11/3/2022 |
| Cancelled: Building - Monolithic Slab |
|
Anthony Aslan |
11/9/2022 |
| Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
11/9/2022 |
| Passed: Building - Slab |
|
Anthony Aslan |
11/9/2022 |
| Cancelled: Building - Wall Sheathing |
|
Anthony Aslan |
12/7/2022 |
| Passed: Building - Strapping |
|
Anthony Aslan |
12/7/2022 |
| Passed: Building - Roof Decking |
|
Anthony Aslan |
12/7/2022 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
12/7/2022 |
| Failed: Plumbing/Gas - 2nd Rough-In |
Master Bath Studs Drill Or Notched More Than 60% Need To Be Doubled |
Anthony Aslan |
2/8/2023 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
2/8/2023 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
2/8/2023 |
| Passed: Mechanical - Rough In |
|
Anthony Aslan |
2/8/2023 |
| Failed: Plumbing/Gas - 2nd Rough-In |
Protection Plates Are Not The Fix For 31/2 Inch Exterior Studs With A 2 3/8 Hole Sawed For A Pipe, Also Need To Address Other Stud Cut Away For Water Line |
Gary Pitzer |
2/10/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
2/14/2023 |
| Passed: Building - Insulation |
Blow In Wall Insulation |
Gary Pitzer |
2/21/2023 |
| Septic Release Inspection |
|
Health Dept |
3/30/2023 |
| Passed: Electrical - Permanent Power |
|
Gary Pitzer |
5/3/2023 |
| Release to power company |
|
Gary Pitzer |
5/3/2023 |
| Passed: Building - Final |
|
Gary Pitzer |
6/22/2023 |