| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/23/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Need Clearance From Concrete Form And Waste Vent Will Check Off On Slab Inspection |
Matt Forsyth |
10/3/2022 |
| Passed: Building - Monolithic Slab |
|
Troy Crews |
10/5/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
10/5/2022 |
| Passed: Electrical - Temporary Service |
Bottom Can Needs Plug, Receptacle Needs Waterproof Cover |
Matt Forsyth |
10/20/2022 |
| Release to power company |
|
Matt Forsyth |
10/20/2022 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
11/16/2022 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
11/16/2022 |
| Passed: Building - Framing |
|
Matt Forsyth |
11/28/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
11/28/2022 |
| Failed: Electrical - 2nd Rough-In |
No Outlet At Front Of House |
Troy Crews |
12/7/2022 |
| Failed: Building - Insulation |
Need To Reschedule Electrical Prior To Insulation |
Troy Crews |
12/9/2022 |
| Cancelled: Building - Final |
|
Troy Crews |
3/22/2023 |
| Failed: Electrical - Permanent Power |
No Rough Electric Or Insulation Approved |
Troy Crews |
3/24/2023 |
| Passed: Electrical - Permanent Power |
Need Letter From Ele. Contractor For Rough In Per Local Code |
Matt Forsyth |
4/3/2023 |
| Septic Release Inspection |
|
Health Dept |
4/3/2023 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/5/2023 |
| Release to power company |
|
Melissa Garber |
4/6/2023 |
| Failed: Building - Final |
It Is The Contractors Responsibility That All Inspections Are Accessible |
Matt Forsyth |
4/14/2023 |
| Passed: Building - Final |
|
Matt Forsyth |
4/18/2023 |