Permit Details

Permit Search

Permit

New Residential Construction

978 SW WASHINGTON AVE
FORT WHITE, FL 32038

Permit #
000045214
Application #
55797
Status Completed
  1. Submitted Jul 22, 2022
  2. Issued Aug 17, 2022
  3. Expires Jan 14, 2024
  4. Completed Jul 18, 2023

Property

Parcel #
00856-003
Owner
The Blackwell Family Trust
Acres
2.80
Subdivision
Three Rivers Estates Unit 11
Zoning
ESA-2
Flood zone
AE
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
34.2 One foot above FEMA Map Elevation
Requirement needed
By Permanent Power Inspection
Document needed is
an Elevation Certificate for Finished Construction
Document receieved
Yes
Fema map number
12023C0458C
Water source
Sante Fe
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1408
Total Area (Sqft)
1720
Building Height
15
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0529
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps
200

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Plan Review - Documents Required
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Plumbing Approved
  8. Plan Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Documents Required
  11. Final Review - Reviewed
  12. Final Review - Reviewed
  13. Final Review - Payment Needed
  14. Permit Issued
  15. Final Review - Documents Required

Contractors

This is an owner-builder project.

Inspections

  1. Jul 26, 2022

    Septic Release Inspection

    Inspected by Health Dept

  2. Sep 9, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Sep 9, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Sep 12, 2022

    Cancelled: Building - Footer

    Inspected by Matt Forsyth

  5. Sep 12, 2022

    Cancelled: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Sep 30, 2022

    Passed: Building - Lintel/Tie Beam

    Inspected by Matt Forsyth

  7. Oct 17, 2022

    Passed: Building - Framing

    Floor Framing Joist Hangers

    Inspected by Matt Forsyth

  8. Nov 23, 2022

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  9. Dec 29, 2022

    Passed: Building - Framing

    Inspected by Matt Forsyth

  10. Dec 29, 2022

    Failed: Electrical - 2nd Rough-In

    Smoke Alarms Not Found

    Inspected by Matt Forsyth

  11. Dec 29, 2022

    Failed: Mechanical - Rough In

    Need Gaskets At All Register Boots

    Inspected by Matt Forsyth

  12. Dec 29, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    Not Complete

    Inspected by Matt Forsyth

  13. Jan 6, 2023

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Water Test

    Inspected by Matt Forsyth

  14. Jan 6, 2023

    Passed: Electrical - 2nd Rough-In

    Item Found

    Inspected by Matt Forsyth

  15. Jan 6, 2023

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Jan 6, 2023

    Passed: Mechanical - Rough In

    Gasket Or Seal At Trimount (ceiling Registers)

    Inspected by Matt Forsyth

  17. Jan 19, 2023

    Passed: Building - Insulation

    Do Not Drywall In Laundry Until Vent Stack Complete Need A Picture

    Inspected by Matt Forsyth

  18. Jun 13, 2023

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  19. Jun 13, 2023

    Release to power company

    Inspected by Matt Forsyth

  20. Jun 13, 2023

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  21. Jul 5, 2023

    Release to power company

    Inspected by Melissa Garber

  22. Jul 14, 2023

    Cancelled: Plumbing/Gas - 2nd Rough-In

    Inspected by Melissa Garber

  23. Jul 18, 2023

    Passed: Building - Final

    Inspected by Matt Forsyth

Documents