Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 545 NW FAIRWAY DR
LAKE CITY, FL 32055
Parcel #: 02309-013
Acres: 0.51
Owner: Patel Pravinchandra J, Patel Nirmala
Subdivision: Fairway View Unit 1
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 55580
Permit #: 000045211
Related Permit: Culvert Waiver: 000045212
Submitted: Friday, July 8, 2022
Issued: Wednesday, August 17, 2022
Expires: Friday, December 15, 2023
Completed: Friday, December 15, 2023
Status: Completed
Septic Release? Yes
Notes:
CHECK SETBACKS IN FIELD LAKE CITY UTLITY CUSTOMER SERVICE NOTES THE CITY OF LAKE CITY PROVIDES WATER, SEWER AND NATURAL GAS IN THIS AREA. THE UTILITY DEPARTMENT APPROVED THE TAP APPLICATION. THE INSTALLATION OF UTILITIES ARE PENDING THE PAYMENT OF UTILITY FEES.
LAKE CITY UTLITY CUSTOMER SERVICE NOTES The City of Lake City provides water, sewer and natural gas in this area. The Utility Department approved the tap application. The installation of utilities are pending the payment of utility fees.
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0280D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 3307
Total Area (Sqft) 4663
Building Height 22
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 22-0601
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Review Notes
7/7/2022 Application pending.
7/8/2022 City of Lake City Utilities Notified
7/8/2022 Point Review - Printed-Online Application
7/8/2022 Point Review - Reviewed
7/11/2022 Point Review - On Hold-Incomplete
8/3/2022 Point Review - Printed-Online Application
8/3/2022 Point Review - Reviewed
8/15/2022 Plan Review - Building Approved
8/15/2022 Plan Review - Electrical Approved
8/15/2022 Plan Review - Mechanical Approved
8/15/2022 Plan Review - Plumbing Approved
8/15/2022 Plan Review - Reviewed
8/16/2022 Zoning Review - Reviewed
8/16/2022 Final Review - Reviewed
8/17/2022 Final Review - Reviewed
8/17/2022 Final Review - Payment Needed
8/17/2022 Permit Issued
5/4/2023 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Leslie R Mcdaniel
Reed Mcdaniel Construction Inc
CBC1255787 Cert. Building Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Paul R Mcdaniel
Reed Mcdaniel Construction Inc Dba Reed Roofing
CCC1330719 Cert. Roofing Subcontractor
Donald Davis
High Springs Electric Inc
EC0002306 Electrical Contractor Subcontractor
Richard M Touchstone
Touchstone Heating & Air Inc
Workers Comp Expired.
CAC058099 Class B A/c Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Matt Forsyth 8/19/2022
Release to power company Matt Forsyth 8/19/2022
Passed: Building - Footer #5 Dowels Will Be Placed At 48 Inches On Center And At Openings Matt Forsyth 8/24/2022
Passed: Engineering - Setbacks Matt Forsyth 8/24/2022
Failed: Plumbing/Gas - 1st Underground Rough–In No Plumbing Installed Troy Crews 9/19/2022
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 9/26/2022
Passed: Building - Slab Need Documentation Of Fibermesh Concrete Being Used Matt Forsyth 10/10/2022
Passed: Building - Vertical Cells/Columns Troy Crews 11/23/2022
Passed: Building - Monolithic Slab Back Porch Matt Forsyth 12/5/2022
Passed: Engineering - Setbacks Matt Forsyth 12/5/2022
Passed: Building - Framing Matt Forsyth 1/19/2023
Passed: Electrical - 2nd Rough-In Matt Forsyth 1/19/2023
Passed: Mechanical - Rough In Gaskets On Boots Matt Forsyth 1/19/2023
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 1/19/2023
Passed: Building - Insulation Matt Forsyth 2/2/2023
Passed: Electrical - Permanent Power Ground Rod And Bear Copper Need To Be Below Ground Level Will Check One Final Need Septic Release Matt Forsyth 5/5/2023
Release to power company Melissa Garber 6/15/2023
Septic Release Inspection Health Dept 6/15/2023
Rescheduled 12/15/2023:Re-Roof - Final Melissa Garber 12/11/2023
Passed: Building - Final Homeowner Installing Stove Ventilation Stack Matt Forsyth 12/15/2023