Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Modular Building - Residential or Commerical Permit

Address 195 SW KNIGHT TER
FORT WHITE, FL 32038
Parcel #: 04238-005
Acres: 0.56
Owner: Pender Dannette R, Pender Dan Eugene Micah
Subdivision: Hollingsworth Bluff
Zoning: ESA-2
Flood Zone: AE
District: 2
Application #: 54620
Permit #: 000045190
Related Permit:
Submitted: Tuesday, May 3, 2022
Issued: Tuesday, August 16, 2022
Expires: Thursday, February 9, 2023
Completed: Thursday, February 9, 2023
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CERTIFICATE REC'D
Job Details
Finished floor requirement
Fema map number 12023C0405C
Type Roofing Job Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) Install pine 1x4s on 24'' centers over existing shingles and cover with 29 ga metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 4900
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Explain if not removing the existing roofing material? Metal over existing shingles
Type of New Roofing Product Metal
Florida Product Approval Number FL-10124-R31
Product Manufacturer Capital Metal
Product Description 29 Gauge Metal
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. metal on pine 1x4s on 24'' centers over existing shingles
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
5/3/2022 Application pending.
5/4/2022 Point Review - Processing
5/25/2022 Point Review - Printed-Online Application NEED: *OWNERS PHONE NUMBER *NEED UPDATED SITE PLAN WITH DIMENSIONS FROM LOT LINES *NO ROOF OPTION SELECTED *ONLY PAGE 6 OF PLANS NEED FULL SET *ENGINEER INFO CELL COMPLETED
5/25/2022 Point Review - Reviewed NEED: *OWNERS PHONE NUMBER *NEED UPDATED SITE PLAN WITH DIMENSIONS FROM LOT LINES *NO ROOF OPTION SELECTED *ONLY PAGE 6 OF PLANS NEED FULL SET *ENGINEER INFO CELL COMPLETED
6/15/2022 Plan Review - Documents Required NEED: *OWNERS PHONE NUMBER *ONLY PAGE 6 OF PLANS NEED FULL SET *ENGINEER INFO CELL COMPLETED NEED OTHER 5 PAGES , NEED DOCUMENTATION WHETHER THIS IS H.U.D. APPROVED HOME OR DCA ?
6/21/2022 Plan Review - Documents Required NEED: *ONLY PAGE 6 OF PLANS NEED FULL SET *ENGINEER INFO CELL COMPLETED NEED OTHER 5 PAGES , NEED DOCUMENTATION WHETHER THIS IS H.U.D. APPROVED HOME OR DCA ?
7/11/2022 Plan Review - Documents Required NEED: *ONLY PAGE 6 OF PLANS NEED FULL SET *ENGINEER INFO CELL COMPLETED * NEED OTHER 5 PAGES , NEED DOCUMENTATION WHETHER THIS IS H.U.D. APPROVED HOME OR DCA? *CRAMER AND SCOTT TO COMPLETE REGISTRATION-- CONTACT EMALEIGH @ 386-758-1008 FOR DETAILS
7/19/2022 Plan Review - Documents Required NEED: *ONLY PAGE 6 OF PLANS NEED FULL SET *ENGINEER INFO CELL COMPLETED * NEED OTHER 5 PAGES , NEED DOCUMENTATION WHETHER THIS IS H.U.D. APPROVED HOME OR DCA? *CRAMER AND SCOTT TO COMPLETE REGISTRATION-- CONTACT EMALEIGH @ 386-758-1008 FOR DETAILS
8/5/2022 Zoning Review - Reviewed NEEDED: ELEVATION CERTIFICATE
8/8/2022 Plan Review - Plumbing Approved NEEDED: ELEVATION CERTIFICATE
8/8/2022 Plan Review - Mechanical Approved NEEDED: ELEVATION CERTIFICATE
8/8/2022 Plan Review - Electrical Approved NEEDED: ELEVATION CERTIFICATE
8/8/2022 Plan Review - Building Approved NEEDED: ELEVATION CERTIFICATE
8/8/2022 Plan Review - Reviewed NEEDED: ELEVATION CERTIFICATE
8/8/2022 Final Review - Reviewed NEEDED: ELEVATION CERTIFICATE
8/15/2022 Final Review - Reviewed NEEDED: ELEVATION CERTIFICATE
8/16/2022 Application Converted Application was converted from New Residential Construction to Modular Building - Residential or Commerical
8/16/2022 Final Review - Payment Needed NEEDED: ELEVATION CERTIFICATE
8/16/2022 Permit Issued Permit #000045190 created and approved.
Contractors
Name/ Business License Title Role
Leslie Weiss
Hydra Engineering & Construction Llc
County License & State License Expired.
CGC1529351 Cert. General Contractor
Randy Collins
C&r Electrical Services,inc.
County License & State License & Liability Insurance & Workers Comp Expired.
EC13005730 Electrical Contractor Subcontractor
James Plant
Legacy Roofing And Construction Of Nfl Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CCC1333244 Cert. Roofing Subcontractor
Arthur D Scott
Dave Scott's Heating And Air
County License & State License & Workers Comp Expired.
CAC1814204 Cert. A/c Class “a” Subcontractor
Daniel Waskom
Williston Services Plumbing Dba All American Plumbing
County License & State License & Liability Insurance & Workers Comp Expired.
CFC1430925 Cert. Plumbing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Setbacks Tight Lot Setbacks Need Surveyor Verification Anthony Aslan 11/3/2022
Passed: Building - Footer Clean Out Footings Where Needed Anthony Aslan 11/3/2022
Passed: Building - Lintel/Tie Beam Anthony Aslan 11/8/2022
Passed: Electrical - Permanent Power Need Elevation Certificate , Need Spetic Release Anthony Aslan 12/20/2022
Failed: Electrical - Permanent Power Received Elevation Certificate And Electric Meter Is Below Required One Foot Above Base Flood Elevation. Need To Raise And Have Elevation Certificate Revised. Troy Crews 12/27/2022
Cancelled: Modular - Strapping Troy Crews 1/9/2023
Cancelled: Electrical - Temporary Service Troy Crews 1/9/2023
Failed: Modular - Strapping Need New Elevation Certificate To Include Power Meter Being Raised. Prior To Permanent Power-- Elevation Certificate Rec'd-- Electric Meter Still Below Mfe Troy Crews 1/17/2023
Cancelled: Modular - Strapping Emaleigh Williams 1/20/2023
Passed: Electrical - Permanent Power -need Septic Release -e3705.7location Of Overcurrent Devices In Or On Premises. overcurrent Devices Shall: 1.be Readily Accessible. [240.24(a)] 2.not Be Located Where They Will Be Exposed To Physical Damage. [240.24(c)] 3.not Be Located Where They Will Be In The Vicinity Of Easily Ignitable Material Such As In Clothes Closets. [240.24(d)] 4.not Be Located In Bathrooms. [240.24(e)] 5.not Be Located Over Steps Of A Stairway. 6.be Installed So That The Center Of The Grip Of The Operating Handle Of The Switch Or Circuit Breaker, When In Its Highest Position, Is Not More Than 6 Feet 7 Inches (2007 Mm) Above The Floor Or Working Platform. [240.24(a)] -e3705.8ready Access For Occupants. each Occupant Shall Have Ready Access To All Overcurrent Devices Protecting The Conductors Supplying That Occupancy -e3405.4outdoor Dedicated Panelboard Space. the Outdoor Space Equal To The Width And Depth Of The Panelboard, And Extending From Grade To A Height Of 6 Feet (1.8 M) Above The Panelboard, Shall Be Dedicated To The Electrical Installation. Piping And Other Equipment Foreign To The Electrical Installation Shall Not Be Located In This Zone. Anthony Aslan 1/25/2023
Release to power company Melissa Garber 1/26/2023
Septic Release Inspection Health Dept 1/26/2023
Failed: Building - Final -dryer Vent Must Be Smooth Pipe -under Pinning Needs To Be Taped Up -platform For Panel Is Incorrect, No Handrails And About 2'ft Away From Panel -some Out Riggers On Frame Cut -wedges On All Piers Are Not Installed Correctly, Not Touching Or Overlapping Each Other -no Hand Rails On Stairs Anthony Aslan 1/31/2023
Passed: Building - Final *the Dryer Pipe Crimped Is Facing In The Direction Of Air Flow, Needs To Meet These Minimum Codes, Although It Is Smooth There Is No Gauge Stamped On The Aluminum Pipe. If You Can Provide Manufacture Specs On Pipe That Meet The Minimum Code Requirements. sectionm1502 clothes Dryer Exhaust m1502.4dryer Exhaust Ducts. dryer Exhaust Ducts Shall Conform To The Requirements Of Sections M1502.4.1 Through M1502.4.7. m1502.4.1material And Size. exhaust Ducts Shall Have A Smooth Interior Finish And Be Constructed Of Metal Having A Minimum Thickness Of 0.0157 Inch (28 Gauge). The Duct Shall Be 4 Inches (102 Mm) Nominal In Diameter. exception: Exhaust Ducts May Be 4 Inches Nominal In Diameter Schedule 40 Pvc When Horizontally Run Beneath The Slab. m1502.4.2duct Installation. exhaust Ducts Shall Be Supported At Intervals Not To Exceed 12 Feet (3658 Mm) And Shall Be Secured In Place. The Insert End Of The Duct Shall Extend Into The Adjoining Duct Or Fitting In The Direction Of Airflow. Exhaust Duct Joints Shall Be Sealed In Accordance With Section M1601.4.1. Ducts Shall Not Be Joined With Screws Or Similar Fasteners. Where Dryer Exhaust Ducts Are Enclosed In Wall Or Ceiling Cavities, Such Cavities Shall Allow The Installation Of The Duct Without Deformation. Anthony Aslan 2/3/2023
Certificate-Release Certificate Contractor Needs To Get State Final Inspection Results. Anthony Aslan 2/9/2023