Permit Details

Permit Search

Permit

Mobile Home

219 SW ARBOR LN
LAKE CITY, FL 32024

Permit #
000045153
Application #
55662
Status Completed
  1. Submitted Jul 13, 2022
  2. Issued Aug 11, 2022
  3. Expires Feb 11, 2023
  4. Completed Aug 15, 2022

Property

Parcel #
02413-008
Owner
Deas Haylee A
Acres
5.68
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0280D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2012
Width (Ft.In)
28
Length (Ft.In)
52
Driveway access to home:
Existing Drive
Installation Decal #
90781
Septic #
21-0428
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA1111301AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Documents Required
  8. Final Review - Reviewed
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • James Foley

    Foley Mobile Home Transport

    License
    IH1078536
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Ronald E Bonds Sr

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

  • Richard H Sapp

    Ace Electric Inc Of North Florida

    License
    EC13006007
    Title
    Electrical Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Aug 2, 2022

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Matt Forsyth

  2. Aug 10, 2022

    Septic Release Inspection

    Inspected by Health Dept

  3. Aug 15, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  4. Aug 15, 2022

    Release to power company

    Inspected by Matt Forsyth

  5. Aug 15, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth