Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
Need Porta Potty |
Anthony Aslan |
8/25/2022 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
8/25/2022 |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/22/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/21/2022 |
Passed: Electrical - Temporary Service |
Need Ground Connected In Meter Can. |
Anthony Aslan |
10/21/2022 |
Passed: Building - Slab |
|
Anthony Aslan |
10/28/2022 |
Passed: Electrical - Temporary Service |
Correction Made |
Anthony Aslan |
10/28/2022 |
Release to power company |
|
Anthony Aslan |
10/28/2022 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
1/4/2023 |
Cancelled: Building - Strapping |
|
Anthony Aslan |
1/4/2023 |
Failed: Building - Roof Decking |
Not Ready |
Anthony Aslan |
1/4/2023 |
Cancelled: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
1/4/2023 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
1/12/2023 |
Passed: Building - Framing |
|
Anthony Aslan |
1/26/2023 |
Passed: Electrical - 2nd Rough-In |
Nail Guards Missing In Some Spots |
Anthony Aslan |
1/26/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
1/26/2023 |
Failed: Mechanical - Rough In |
Dryer Pipe Ovaled At Top Plate
flex Not Sealed To Boots And Mixing Boxes
exhaust Flex Not Strapped, Hall Bath Exhaust Flex Vented Over Window Not Allowed |
Anthony Aslan |
1/26/2023 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
3/9/2023 |
Passed: Building - Insulation |
|
Anthony Aslan |
3/9/2023 |
Cancelled: Electrical - Permanent Power |
|
Melissa Garber |
8/18/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
8/22/2023 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
8/22/2023 |
Release to power company |
|
Melissa Garber |
8/28/2023 |
Septic Release Inspection |
|
Health Dept |
8/28/2023 |
Passed: Building - Final |
Outside Air Does Not Exist The Soffit.
r303.5opening Location.
outdoor Intake And Exhaust Openings Shall Be Located In Accordance With Sections R303.5.1 And R303.5.2.
r303.5.1intake Openings.
mechanical And Gravity Outdoor Air Intake Openings Shall Be Located Not Less Than 10 Feet (3048 Mm) From Any Hazardous Or Noxious Contaminant, Such As Vents, Chimneys, Plumbing Vents, Streets, Alleys, Parking Lots And Loading Docks.
for The Purpose Of This Section, The Exhaust From Dwelling Unit Toilet Rooms, Bathrooms And Kitchens Shall Not Be Considered As Hazardous Or Noxious.
exceptions:
1.the 10-foot (3048 Mm) Separation Is Not Required Where The Intake Opening Is Located 3 Feet (914 Mm) Or Greater Below The Contaminant Source.
2.vents And Chimneys Serving Fuel-burning Appliances Shall Be Terminated In Accordance With The Applicable Provisions Of Chapters 18 And 24.
3.clothes Dryer Exhaust Ducts Shall Be Terminated In Accordance With Section M1502.3.
r303.5.2exhaust Openings.
exhaust Air Shall Not Be Directed Onto Walkways.
r303.6outside Opening Protection.
air Exhaust And Intake Openings That Terminate Outdoors Shall Be Protected With Corrosion-resistant Screens, Louvers Or Grilles Having An Opening Size Of Not Less Than 1/4 Inch (6 Mm) And A Maximum Opening Size Of 1/2 Inch (13 Mm), In Any Dimension. Openings Shall Be Protected Against Local Weather Conditions. Outdoor Air Exhaust And Intake Openings Shall Meet The Provisions For Exterior Wall Opening Protectives In Accordance With This Code. |
Anthony Aslan |
9/15/2023 |
Certificate-Release Certificate |
Rec'd Pictures |
Anthony Aslan |
9/18/2023 |