Mobile Home
Permit
| Application #: | 55330 |
| Permit #: |
000044953 |
| Related Permit: |
|
| Submitted: | Thursday, June 23, 2022 |
| Issued: | Wednesday, July 13, 2022 |
| Expires: | Thursday, August 11, 2022 |
| Completed: | Thursday, August 11, 2022 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0290D |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2022 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
52 |
| Driveway access to home: |
Culvert Waiver |
| Installation Decal # |
90780 |
| Septic # |
22-0594 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
FLE260GA2167449AB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 6/23/2022 |
Application pending. |
| 6/24/2022 |
Point Review - Printed-Online Application |
| 6/24/2022 |
Point Review - Reviewed |
| 6/27/2022 |
Plan Review - Reviewed |
| 6/27/2022 |
Zoning Review - Reviewed |
| 6/28/2022 |
Final Review - Documents Required |
| 6/28/2022 |
Final Review - Documents Required |
| 6/28/2022 |
Final Review - Documents Required |
| 7/7/2022 |
Final Review - Reviewed |
| 7/13/2022 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
James Foley Foley Mobile Home Transport
County License & State License Expired. |
IH1078536 |
Mh Installer (ih) |
Contractor |
Richard H Sapp Ace Electric Inc Of North Florida
|
EC13006007 |
Electrical Contractor |
Subcontractor |
Ronald E Bonds Sr Style Crest Inc
|
CAC1817658 |
Class "b" A/c Contractor |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Rainwater Running Under House Need Proper Drainage (dirt Work) On East End Gable Side |
Matt Forsyth |
8/9/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/9/2022 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Need Septic Release For Power |
Matt Forsyth |
8/11/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/11/2022 |
| Septic Release Inspection |
|
Health Dept |
8/12/2022 |
| Release to power company |
|
Melissa Garber |
8/18/2022 |