Permit Details

Permit Search

Permit

Roof Replacement or Repair

369 NE DIANA TER
LAKE CITY, FL 32055

Permit #
000044947
Application #
55637
Status Completed
  1. Submitted Jul 12, 2022
  2. Issued Jul 12, 2022
  3. Expires Jan 23, 2023
  4. Completed Jul 27, 2022

Property

Parcel #
04967-018
Owner
Velasquez David
Acres
1.02
Subdivision
Five Points Acres
Zoning
RSF/MH-2
Flood zone
X
District
1

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0285D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2310
No. of Stories
1
Roof Pitch
2:12 to 4:12
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL18355_R5_II
Product Manufacturer
TamKo
Product Description
limited LIFETIME ASPHALT SHINGLES
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Repair Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal

Status & Review History

  1. Application pending.
  2. City of Lake City Utilities Notified
  3. Final Review - Corrections Needed
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Jul 19, 2022

    Passed: Re-Roof - In Progress

    Inspected by Anthony Aslan

  2. Jul 27, 2022

    Cancelled: Re-Roof - Final

    Inspected by Anthony Aslan

  3. Jul 27, 2022

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan

  4. Jul 27, 2022

    Cancelled: Re-Roof - Final

    Inspected by Troy Crews